7. Connection Procedure
4
The Transfer from PLC Dialog
Box is displayed. Select the
I/O
Table
Check Box and the
SIO
Unit Parameters
Check Box,
and click the
Transfer
Button.
The Transfer from PLC Dialog
Box is displayed.
Confirm that the transfer was
normally executed by checking
the message in the dialog box.
When the I/O table is created
normally, the dialog box shows
the following:
Transfer Success: 1 Unit
Transfer Unsuccessful: 0 Unit
Click the
OK
Button.
Precautions for Correct Use
Confirm that the Ethernet cable is connected before proceeding to the following procedure.
If it is not connected, turn OFF the power supply to each device, and then connect the
Ethernet cable.
18
Содержание CJ1W-NC82
Страница 35: ...32...
Страница 36: ...2013 0911 P562 E1 01...