![background image](http://html1.mh-extra.com/html/omron/ba100r/ba100r_instruction-manual_744582082.webp)
5 To perform shutdown processing of the devices when a power failure occurs
5-2 When using the UPS monitoring software
2.
Install the “PowerAct Pro” or “Simple Shutdown Software” to the PC you want to shut
down.
Note: Installation method:
For “PowerAct Pro”, refer to the installation guide (for Windows) on the CD-ROM.
Refer to the manual for “Simple Shutdown Software”.
Notes
The limitation on the commercial power stopped period when scheduled
operation using the UPS monitoring software
●
When performing scheduled operation in which the UPS is stopped and a device
such as a breaker is used to stop the UPS at the same time that commercial
power stops, specify a period of no more than 3 months (*) for the start of the next
operation.
・
If you specify a period longer than 3 months (*), the internal timer is reset and the
scheduled operation does not start. Note that this period reduces to
approximately half when the battery is dead.
・
If a period of 3 months (*) is exceeded, you start operation by supplying
commercial power and pressing the Start Switch. However, if the battery is dead,
you may not be able to start operation.
In this case, replace the battery according to "4-2 Replacing the battery".
* Note the time span will be shortened about half on the time to replace the battery.
When manually starting during the scheduled operation using the UPS
monitoring software
●
To manually start up this unit after it has been stopped by a scheduled operation,
turn OFF the “Power” switch and turn it back ON again.
To stop the unit when it is in operation, turn OFF the “Power” switch.
Auto restart after OS closing processing using the UPS monitoring software.
When the power is restored while auto shutdown processing is being
performed
●
If a power failure occurs and then the power is restored while auto shutdown is
still in progress, UPS output will stop temporarily after the set time elapses. After
shutdown is finished, do not turn on the computer until the UPS has finished
restarting.
BA75T/BA100T/BA100R
81
5
Содержание BA100R
Страница 23: ...2 Installation and connection 2 1 Installation Incorrect Positions BA75T BA100T BA100R 22...
Страница 87: ...8 Note of Chinese 8 Note of Chinese UPS UPS 1 UPS FA OA Windows BA75T BA100T BA100R 86...
Страница 88: ...8 Note of Chinese 2 FA OA A VCCI A BA75T BA100T 12 5 BA100R 13 BA75T BA100T BA100R 87 8...
Страница 89: ...8 Note of Chinese AC AC100V 110V 115V 120V 50 60Hz AC UPS 10 90 0 C 40 C 25 85 BA75T BA100T BA100R 88...
Страница 90: ...8 Note of Chinese 5cm AC 25 5 30 4 AC AC AC AC BA75T BA100T BA100R 89 8...
Страница 91: ...8 Note of Chinese ON OFF AC INPUT PROTECTION 1mA AC UPS AC UPS BA75T BA100T BA100R 90...
Страница 92: ...8 Note of Chinese BA75T BA100T BA100R 91 8...
Страница 93: ...8 Note of Chinese AC UPS 25 25 6 40 2 AC AC DC250V BA75T BA100T BA100R 92...
Страница 94: ...8 Note of Chinese UPS 100V http www fa omron com cn AC AC 50 60Hz 3 3 3 Pb BA75T BA100T BA100R 93 8...
Страница 97: ...9 References 9 2 Dimensions 9 2 Dimensions Unit mm Tolerance 2mm BA75T BA100T BA100R BA75T BA100T BA100R 96...
Страница 98: ...9 References 9 2 Dimensions Unit mm Tolerance 1mm Upright stand for BA75T 100T BAP100T BA75T BA100T BA100R 97 9...
Страница 99: ...9 References 9 2 Dimensions Upright stand for BA100R BAP100R BA75T BA100T BA100R 98...
Страница 100: ...9 References 9 2 Dimensions Rubber feet BA75T BA100T BA100R 99 9...
Страница 101: ...9 References 9 2 Dimensions Using Ear brackets BAP100RS BA75T BA100T BA100R 100...
Страница 103: ...9 References 9 4 China RoHS Information 9 4 China RoHS Information BA75T BA100T BA100R 102...