17
Setting Up the Test
1. If you apply a second
CP CR500
unit, connect it to the Safety B connector of
the first
CP CR500
unit using the second modem-cable (length 9 m). Close
the Safety B connector on the second unit with the
CPC 100
dongle.
2. Connect both
CP CR500
units to the test object using the high-voltage
cables (4-4 ”Connecting two CP CR500 units in parallel”).
3. Connect both low-voltage LV connectors to each other using the delivered
standard connection leads 1 x 2 m x 2.5 mm² (black).
Figure 4-4:
Connecting two
CP CR500
units in
parallel
Connection Configuration
C-values [
μ
F] and V
max
-values [kV]
at different resonance frequencies [Hz]
# units # parll. L [H] I
max
[A]
35
42
50
60
71
85
Hz
1
1
40.0
1.0
0.52/8.4 0.36/10 0.25/12 0.18/12 0.13/12 0.09/12
μ
F/kV
2
20.0
2.0
1.03/8.4 0.72/10 0.51/12 0.35/12 0.25/12 0.18/12
μ
F/kV
2
3
13.3
3.0
1.55/7.7 1.08/9.3 0.76/11 0.53/11 0.38/11 0.26/11
μ
F/kV
4
10.0
4.0
2.07/7.7 1.44/9.3 1.01/11 0.70/11 0.50/11 0.35/11
μ
F/kV
4 HV Cables
CP CR500
Safety
*)
CPC 100 dongle
HV Cable
CP TD1
Cx
Clamp with
sockets
Grounding cable (yellow/green)
*)
Note:
This is not the OMICRON-supplied red
connecting cable. It is diplayed red here to denote
its importance for operational safety!
Содержание CP CR500
Страница 6: ...CP CR500 6...
Страница 10: ...CP CR500 10...
Страница 18: ...CP CR500 18...
Страница 38: ...CP CR500 38...
Страница 40: ...CP CR500 40...
Страница 42: ...OMICRON Contact Addresses 42...