
13
Setting Up the Test
4 Setting Up the Test
The test setup consists of the
CPC 100
and
CP TD1
test system, the
CP CR500
compensating reactor(s) and the test object itself.
4.1 First Step: Grounding
Caution:
For a safe operation make sure that all units involved and the trolley, if used, are
connected to the common equipotential ground. Use earth connection cables of
at least 6 mm² cross-section. Never operate the test setup without solid
grounding.
Connect
CPC 100
,
CP TD1
, the
CP CR500
compensating reactor(s) and the
test object as described below.
Figure 4-1:
Principle diagram of test
setup
CP TD1
CP CR500
To next
CP CR500
or to
CPC 100
dongle
12 kV
Cx
Safety
Measurement
Booster Serial
CPC 100
Modem cable
Содержание CP CR500
Страница 6: ...CP CR500 6...
Страница 10: ...CP CR500 10...
Страница 18: ...CP CR500 18...
Страница 38: ...CP CR500 38...
Страница 40: ...CP CR500 40...
Страница 42: ...OMICRON Contact Addresses 42...