4
13.5
R
EPLACEMENT OF THE NOZZLES
........................................................................................................................ 52
14 TROUBLESHOOTING .................................................................................................................................. 53
14.1
C
ONTROLLER
................................................................................................................................................ 53
14.2
C
ONTROL
V
ALVES
.......................................................................................................................................... 53
14.3
L
EAKAGE
...................................................................................................................................................... 54
14.3.1 A leak between the block and the tower .......................................................................................... 54
14.3.2 A leak between the valve and the block ........................................................................................... 55
14.4
H
IGH PRESSURE DROP
..................................................................................................................................... 57
14.4.1 Inadequately dimensioned compressor and dryer ............................................................................ 57
14.4.2 The downstream system is oversized ............................................................................................... 57
14.4.3 Oil in the adsorption dryer ................................................................................................................ 58
14.4.4 Dryer connected to the system in the opposite way ......................................................................... 58
14.4.5 Solenoid control valves malfunction ................................................................................................. 58
14.4.6 Clogged pre-filter and/or after-filter ................................................................................................ 59
14.4.7 Increased purge flow on one tower .................................................................................................. 59
14.5
H
IGH OUTLET DEW
-
POINT
............................................................................................................................... 59
14.5.1 Underdiemnsioned adsorption dryer ............................................................................................... 60
14.5.2 Liquid water in the towers ................................................................................................................ 60
14.5.3 Oil in the towers ................................................................................................................................ 60
14.5.4 Tower fails to depressurise ............................................................................................................... 61
15 WARRANTY EXCLUSION ............................................................................................................................. 62
16 MAINTENANCE RECORD ............................................................................................................................ 63
Содержание A-DRY Series
Страница 2: ...2...
Страница 16: ...16...
Страница 37: ...37 5 9 1...
Страница 38: ...38 Console layout for DRY 6 DRY 12 DRY 24 and DRY 36 Console layout for DRY 60 DRY 75 and DRY 105 9 3 9 2...
Страница 46: ...46 13 6 13 7...
Страница 48: ...48 Normally open valve Normally closed valve 13 10 13 11...
Страница 50: ...50 13 15...
Страница 56: ...56 14 6 14 7...
Страница 63: ...63 16 Maintenance record TYPE OF MAINTENANCE DATE SIGNATURE NOTES Commissioned...
Страница 64: ...64...