35
LAYOUT 1 (Dryer is installed downstream from pressure vessel)
•
When only partial flow rate of the compressor is treated by the dryer.
LAYOUT 2 (Dryer is installed upstream from pressure vessel)
•
When total flow rate of the compressor is treated by the dryer.
•
When consumption of compressed air varies a lot or when short peaks of high
consumption (higher than dryer/compressor capacity) are expected.