Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8
13.
When holes are
aligned, slide 4 - Carriage
Bolts from the outside
through Post and “T” Post
Mount Plates.
15.
From the inside, slide a
Flange Nut over bolt and tighten.
Important:
Only snug Carriage Bolts at this
stage. After Handrail and Upper
Baluster Section are installed,
come back and firmly tighten all
Carriage Bolts with a wrench.
14.
Complete all four “T” Post
Mount and Post Carriage Bolt
attachments.
Important:
Once again, only snug Carriage Bolts
at this stage. After Handrail and Upper
Baluster Section are installed, come
back and firmly tighten with wrench.
Flange Nut