Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15
35.
Lift a completed Upper Rail Section
up and place between the Rafters and
Posts.
Once Upper Rail alignment is confirmed,
complete remaining Upper Rail
Assemblies.
36.
Position Upper Rail Section so Pre-drilled holes in End Caps line up with Pre-drilled holes in
Rafter. With holes aligned, carefully hammer Carriage Bolt through Upper Rail Section and Rafter.
Do not secure washers and nuts of Carriage Bolts until
Step 37.
Bang Carriage Bolts
through holes.
Important-
Left and Right Upper Rail
Ends Caps must be aligned correctly.
Upon completion of first Rail Section,
test fit Section as per
Step 35.
C. Rail Section
34.
Locate Upper Rail Sections (8) and Upper
Rail End Caps (8 left / 8 right). Align Caps on
Rail Section flush at the bottom and evenly
spaced from side to side. See Pictures to the
right to confirm alignment prior to attaching.
Left and Right Upper
Rail End Caps.
Flush at
bottom.
Evenly
spaced
from side
to side.
Bevel edge of cap
positioned to outside.
Counter
sunk hole
to outside.
Outside View
Inside View
Attach with
4 - 2” screws.
Straight
edge of
cap to
inside.