Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 4
A. Floor Section
1.
Locate both the
Long Main Floor Joist
and
the
“T” Post Mount Plate. Angle cut ends
must be positioned to the outside.
Pre-drilled holes will align with Posts later in
Step
10.
Please review this step to confirm correct “T”
Post Mount Plate orientation. Use 4 - Carriage
Bolts to align Joist with “T” Plate prior to attach-
ing. Joist must be evenly spaced between bolts.
Remove Carriage Bolts when correctly aligned.
2.
With pieces properly orientated, screw
“T” Plate and Joist together with 2 - 3” screws. Make
sure pieces are flush with each other on the top and
bottom. Complete all 8 Long Main Floor Joist and “T”
Post Mount Plate Connections. Once again, check
alignment prior to attaching together.
Long Main Floor Joist
68 7/16” long
“T” Post Mount
with Holes Drilled
Drilled Holes
Measure to center of Plate
Joist evenly
spaced between
bolts.
3.
Locate the 5 1/4” Diameter
Octagon
Core Block
. Place at
end of one of the Long Main
Floor Joists.
“T” Post Mount Plate 23 13/16” long