45.
To complete Handrail Sections, locate Hand Rails and Hand Rail End Caps. Position End Cap
flush with Bottom Rail. Evenly space End Caps from side to side with both Top and Bottom Rails.
Flush
Hand Rail Section
Hand Rail
End Caps
44.
Complete remaining 7 Mid Rafters following
Steps 42 -43.
Important-
make sure each rafter is properly positioned from side to side and up and down.
43.
Center Mid Rafter on Upper Rail Section (the midpoint of the Upper Rail Sections is approximately
25 1/2” measured from the inside on the Upper Rail). From the inside, angle screw a 3” screw from
Upper Rail Section into bottom of Mid Rafter.
Mid
Rafter
Inside
of Upper
Rail Section
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17