2_MANUAL DE INSTALACIÓN
OJMAR 35
b. Press the cover at the bottom
for clipping the cover onto the
lock.
6. Assembly of the led viewer:
a. Clean the surface of the door and make sure it is dry.
b. Peel off the plastic film
from the emblem.
c. Insert front panel bulge
in the hole connecting of
the lock and make sure
that the led viewer is
aligned with the locker
door.
Click!!!
Содержание Nexo NLX1
Страница 1: ...E S P INSTRUCTIONS MANUAL VERSION 2 0 NEXO NLX1 SYSTEM...
Страница 2: ......
Страница 3: ...INSTRUCTIONS MANUAL VERSION 1 0 NEXO NLX1 SYSTEM...
Страница 7: ...CONTENTSOJMAR 7 PAGE LEFT BLANK INTENTIONALLY...
Страница 14: ...2_MANUAL DE INSTALACI N The following files will appear in the selected folder jre Ojmar API exe...
Страница 33: ...2_MANUAL DE INSTALACI N OJMAR 33 Figure 2 3 Measurements of the smooth strike in mm inches Figure 2 of 2...
Страница 39: ...2_MANUAL DE INSTALACI N OJMAR 39 PAGE LEFT BLANK INTENTIONALLY...
Страница 57: ...3_PUESTA EN MARCHA OJMAR 57 PAGE LEFT BLANK INTENTIONALLY...
Страница 62: ...5_MANUAL DE MANTENIMIENTO 1 2 3 User key master or service 4...
Страница 70: ...5_MANUAL DE MANTENIMIENTO...
Страница 74: ...5_MANUAL DE MANTENIMIENTO PAGE LEFT BLANK INTENTIONALLY...
Страница 150: ...7_API REFERENCE MANUAL options BT group 1 range_from 1 range_to 100...
Страница 184: ...7_API REFERENCE MANUAL PAGE LEFT BLANK INTENTIONALLY...
Страница 186: ...7_API REFERENCE MANUAL Option b...
Страница 187: ...7_API REFERENCE MANUAL OJMAR 187 Option c INSTALLING ONE ROUTER PER 50 LOCKS IS RECOMMENDED...
Страница 188: ...7_API REFERENCE MANUAL...