CHAPTER 3 MAINTENANCE PROCEDURES
Ohaus Corporation www.ohaus.com
3-54
Pioneer
™ Balances Service Manual
3.3.34 Setting the Up/Down Stop Screw on Block Style Load Cells
This procedure is required when either the Ratio Beam has been removed or replaced, or when
the Position Sensor has been replaced.
1. Disconnect the Ribbon Cable from the Contact Board to the Load Cell PCB.
2. The Load Cell must be completely reassembled and installed in the balance
Housing.
3. Plug the Ribbon Cable from the top of the Load Cell PCB into the Main PC Board.
4. Attach a Voltmeter (DC range) to the pins on the Load Cell PCB test connector, as
shown in Figure 3-159.
5.
Apply power to the balance.
Figure 3-159. Load Cell PCB Test Connector.
Figure 3-160. Test Connector Detail.
6. Measure the voltage with the Ratio Beam at the
bottom
of the Up/Down Stop Screw.
7. Carefully lift the Ratio Beam with
thumb and forefinger until it is at
the top of the Up/Down Stop
Screw. Measure the voltage again.
8. If the two voltage values either side
of zero are not of the same
magnitude, e.g. +2 V and
–1.6 V,
the vertical stop must be adjusted
until the values are symmetrical.
Maximum difference is 0.2 Volts.
9. To adjust the Up/Down Stop Screw,
Figure 3-161. Up/Down Stop Screw
turn the Screw and repeat Steps 2 and 3 until the readings are within specifications.
(See Figure 3-161.)
Test Connector
Test Connector
To Voltmeter
Содержание Pioneer PA64
Страница 1: ...SERVICE MANUAL Ohaus Corporation 19A Chapin Road P O Box 2033 Pine Brook NJ 07058 2033 973 377 9000 ...
Страница 2: ......
Страница 10: ...TABLE OF CONTENTS Pioneer Balances Service Manual viii Ohaus Corporation www ohaus com ...
Страница 106: ...CHAPTER 5 PARTS LISTS DIAGRAMS Ohaus Corporation www ohaus com 5 18 Pioneer Balances Service Manual ...
Страница 115: ......