CHAPTER 3 – MAINTENANCE PROCEDURES
MB90 MB120 Series Service Manual
37
Ohaus Corporation www.ohaus.com
3. Locate and remove the two screws securing the AC plug to the housing.
4. Remove and replace the AC Plug by shifting the plug upwards.
3.7 Replacing the control board
1. Open the Analyzer (Refer to 3.2)
2. Detach the Top Housing.
3. Locate the Control Board which is above the load cell.
4. Locate the 5 screws securing the Control Board to the housing and detach the load
cell cable and cable from Control Board to Power Board.