Installation
36
GA03107_002_A4 - 09/2015 - © Oerlikon Leybold Vacuum
1
2
4
5
6
7
8
9
10
11
12
3
14
13
3
Installation
Only fill in the oil after having installed the pump.
3.1 Installation
Install RUVAC WA/WAU pumps on a flat, horizontal surface (1° max. tilt).
If the pump is not level, lubricant may enter the pumping chamber from the
gear chambers.
Keep the air intake and exhaust ducts for cooling the motor unobstructed (for
minimum clearance with respect to the fan cowl, see Fig. 1.5).
The pump’s ambient temperature should be between 12 °C and 40 °C .
Lower temperatures hamper run-up; higher ones shorten the lubricant
change intervals and may lead to greater wear.
Special oil for operation at temperatures below 12 °C is available upon
request.
NOTICE
NOTICE
Fig. 3.1 Connections and controls
1 Discharge flange
2 Oil-level glass
3 Crane eye
4 Oil-fill port
5 Intake flange
6 Connection for pressure switch
7 Adapter
8 Pressure switch
9 Centering and clamping ring
10 Right-angle bend
11 Oiler
12 Direction-of-rotation arrow
13 Junction box
14 Fan cowl
Arrows = Direction of flow
Содержание RUVAC WA
Страница 67: ...Notes 67 GA03107_002_A4 09 2015 Oerlikon Leybold Vacuum ...
Страница 68: ...68 GA03107_002_A4 09 2015 Oerlikon Leybold Vacuum EC Declaration of Conformity ...
Страница 69: ...69 GA03107_002_A4 09 2015 Oerlikon Leybold Vacuum EC Incorporation Declaration ...
Страница 71: ...Index 71 GA03107_002_A4 09 2015 Oerlikon Leybold Vacuum ...