44
24.0
OEG – Solar and storage technology
4flex
®
tube collectors
GB
Date of inspection
Expansion vessel
setting before filling
System pressure
Expansion
vessel setting
after filling
Flow rate
Anti-freeze
concentration
pH-value
Inspection of
barium getter
on tubes
Engineer
Name in
printed letters
Signature/stamp
Telephone number
After c
om-
missioning
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Year 14
Year 15
Year 16
Year 17
Year 18
Year 19
Year 20
Year 2
1
Year 22
Year 2
3
Year 24
Year 2
5
Maintenanc
e f
orm
The jobs listed below should be carried out by a ser
vice engineer
. The
shaded bo
xes are only relevant if
the system req
uires re
fil
ling
.
Содержание 4flex 100
Страница 23: ...F r Ihre Notizen...
Страница 45: ...Notes...
Страница 67: ...Pour vos notes...
Страница 89: ...Voor uw aantekeningen...
Страница 90: ...Voor uw aantekeningen...
Страница 91: ......