33
Installation of
the first tube
11.0
The tubes are mounted in the same way for all roof types.
Align the first tube with the left side towards the rail (see Fig. 1 and Fig. 3). Press the
collector head into the mounting groove (see Fig. 2). The tube snaps into position with a
well audible click. If necessary, the lower tube supporting clip can be loosened and pushed
into position (see Fig. 4) depending on the length L1 (see page 31).
After the alignment, the lower clip must be pressed into the mounting groove, too.
Fasten the collector head and the supporting clip with M8 screws to the upper and
lower mounting rail (see Fig. 5 and Fig. 6).
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
OEG – Solar and storage technology
4flex
®
tube collectors
GB
Содержание 4flex 100
Страница 23: ...F r Ihre Notizen...
Страница 45: ...Notes...
Страница 67: ...Pour vos notes...
Страница 89: ...Voor uw aantekeningen...
Страница 90: ...Voor uw aantekeningen...
Страница 91: ......