background image

Date 

Reason for visit/Action taken 

Engineers Signature

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

/20

This Manual must be completed in accordance with the guidelines below, at any point  service/repair
work is carried out on the product. This is to achieve two things;

1. To keep a history of the product for yourself and your supplier/manufacturer.
2. To keep an accurate log of any historical or recent modifications, and/or problems, to help an
engineer in the event of any future work required on the product.
3. This page is continued on the next page if extra space is needed.

!

D

3250

Service Log.

Содержание D3250

Страница 1: ...Maximum span 7 0 100 Duty cycle Automatic Barrier d3250 Made in the...

Страница 2: ...07 09 7 Commissioning Certificate Page 10 8 Manual release Page 11 9 Terminal connections Page 12 10 Control panel layout Page 13 11 Using the controller Display Page 14 12 Barrier Parameters Page 15...

Страница 3: ...ade to be 100 accurate in this manual but we cannot make any guarantees As we constantly innovate our products we may change the quoted spec and any other details that have been documented in this man...

Страница 4: ...It covers the main areas that cause the majority of injuries and ill health to workers including Workplace transport Slips trips and Musculoskeletal disorders MSD The movement of goods presents us as...

Страница 5: ...installation of a D3250 Automatic barrier for a single entrance Control Dual height Card access entry Loop safety lower with Auto loop exit Shown above is a very basic layout There are many types of...

Страница 6: ...General Layout Foundation drawing D3250...

Страница 7: ...order as they are referred to throughout this manual note this can change per barrier spec i e manual components are different from automatic Barrier Cabinet c w Pole Arm Adaptor End Rest Pole if ove...

Страница 8: ...ater Then after checking the barrier is Still in line and level proceed to drill and bolt in the Rest of the fixing bolts Once all bolts are in make Sure they are tightened down Guide to Physical Inst...

Страница 9: ...in shaft that operate the limit Switches These are what you may need to adjust For example if the pole is stopping short of its tip Support in the lower position then you will need to Back the lower s...

Страница 10: ...ineers Installing Commissioning Equipment Fitted Handover Date Part 2 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Sig...

Страница 11: ...every 6 months or sooner dependant on use Barrier will not work properly without photo cell function Have a qualified technician installer check the correct setting of the electric clutch If the power...

Страница 12: ...rier 17 Connect to terminal 5 in slave barrier 18 Connect to terminal 4 in slave barrier 19 Connect to terminal 3 in slave barrier When used as a Master Barrier below terminals will be situated on the...

Страница 13: ...yout 240v Terminals 240v Breaker 24VDC Power supply PLC Inverter Loop Detector Low voltage terminals 24v Fuse 1Amp Programming screen Above shows a typical barrier control panel layout which identifie...

Страница 14: ...interface You will see the screen shown in The left diagram which shows Settings you can alter One very Useful feature is the R4 and R3 Key can raise and lower the barrier As shown in the bottom righ...

Страница 15: ...network cable this Option turns on the outputs to run an inverter hard Wired OFF Raise Timeclock This turns ON the raise timeclock which will hold the Barrier up at set times of the day See timeclock...

Страница 16: ...change D3250 Barrier Timers Lower delay Slow down delay Traffic light delay Lower delay No pass delay Slow down delay Delays the traffic light from going Straight to green once the gate has fully open...

Страница 17: ...eriod 1 Select Alarm On Time Off Time 0900 1700 In Range 0 When you select a period time set it will Take you to the on off time for that Period you can now set the times you Need the barrier to stay...

Страница 18: ...Open Motor controller close direction Active to lower barrier Q3 Normally Open Boom Lights Active to operate boom lights Q4 Normally Open Traffic light relay Active when green light in Q5 Normally Ope...

Страница 19: ...Blank screen on PLC but power to other devices in the control panel On board fuse blown Replace fuse and reset barrier PLC has developed an electrical fault or had a power spike Change PLC Barrier do...

Страница 20: ...the photocell optical components and make sure they are free from dirt water rain soil etc Batteries in photo cells may need to be changed every 6 months or sooner dependant on use Barrier will not wo...

Страница 21: ...e repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or...

Страница 22: ...5 Amps Drive Motor 3 Phase motor wormed gearbox Opening Closing time 1 5 7 0 seconds Duty Cycle 100 continuos duty rating Operation Time 8 Seconds per metre Variable Finish Polyester Powder Coated Di...

Отзывы: