The principle of wiring is shown in
FIG. 11
. It should be noted that the pump m
ust be wired directly to the boiler terminal block on FULLY PUMPED systems
and to thejunction box or programmer on combined GRAVITY HOT WATER/P
UMPED CENTRAL HEATING systems.
FIG. 12. WIRING THE BOILER FOR A FULLY PUMPED SYSTEM
Pull off the boiler thermostat knob. See
FIG. 2
.
Remove two screws securing control panel cover and remove cover.
Route a four core cable through the plastic bush in the rear of the control pane
l and the cable clamp as illustrated
FIG. 12
. Connect the cable to the boiler in
put terminals asfollows:
Permanent live to terminal marked MAINS
‘L’
Neutral to terminal marked MAINS
‘N’
Earth to terminal marked MAINS
‘ ’
Switched live from external controls to terminal marked MAINS
‘SwL’
If there are no external controls fitted connect the SwL terminal to permanent l
ive in the junction box. Secure the cable within the cable clamp by tightening t
he two securingscrews.
Following the pump
manufacturer’s instructions connect the pump supply wire
s to terminals marked PUMP L, N and on the boiler terminal block. Route th
e cable throughthe plastic bush in the rear of the control panel and the cable c
lamp as illustrated
FIG. 12
. Secure the cable within the clamp by tightening th
e two securing screws.
Refit control panel cover and thermostat knob.
CONNECTING SYSTEM PIPEWORK - Page 15
Содержание CF 20/35
Страница 4: ......
Страница 5: ...Page 4 INSTALLATION DATA Page 5 FIG 2 GENERAL ARRANGEMENT...
Страница 6: ...Page 5...
Страница 17: ...FIG 4 OPEN VENTED FULLY PUMPED SYSTEM FITTED WITH A COMBIN ED FEED AND VENT Page 10 TECHNICAL DATA Page 11...
Страница 18: ...FIG 5 FULLY PUMPED SEALED SYSTEM FIG 6 OPEN VENTED GRAVITY DOMESTIC HOT WATER AND PUMPED CENTRAL HEATING SYSTEM...
Страница 43: ...Page 25...