Initial System Pressure (bar)
1.0
1.0
Expansion Vessel Volume
(litres)
V X 0.11
V X 0.087
Cylinder
The hot water cylinder must be an indirect coil type or a direct cylinder fitted wi
th an immersion calorifier suitable for operating at a gauge pressure of 0.3 bar
(5
lbf/in²) inexcess of safety valve setting. Single feed indirect cylinders are n
ot suitable for sealed systems.
Method of Make-Up
Provision shall be made for replacing water loss from the system either:
i) from a make-
up vessel or tank mounted in a position higher than the top point of the system
, and connected through a non-
return valve either to the system on the returnside of hot water cylinder or the
return side of all heat emitters.
or
ii) where access to a make-
up vessel would be difficult, by using the mains top up method or a remote aut
omatic pressurisation and make up unit as illustrated in
FIG. 5
METHODS 1 an
d 2.
Mains Connection
There shall be no connection to the mains water supply or to the water storag
e tank which supplies domestic water even through a non-
return valve, without the approval ofthe local Water Authority.
Filling Point
The system shall be fitted with a filling point at low level which incorporates a
stop valve to BS. 1010 and a double check valve (approved by the National W
ater Council) tobe fitted in this order from the system mains. Refer to
FIG. 5
M
ETHOD 1.
Содержание CF 20/35
Страница 4: ......
Страница 5: ...Page 4 INSTALLATION DATA Page 5 FIG 2 GENERAL ARRANGEMENT...
Страница 6: ...Page 5...
Страница 17: ...FIG 4 OPEN VENTED FULLY PUMPED SYSTEM FITTED WITH A COMBIN ED FEED AND VENT Page 10 TECHNICAL DATA Page 11...
Страница 18: ...FIG 5 FULLY PUMPED SEALED SYSTEM FIG 6 OPEN VENTED GRAVITY DOMESTIC HOT WATER AND PUMPED CENTRAL HEATING SYSTEM...
Страница 43: ...Page 25...