INSTALLATION INSTRUCTIONS - Page 13
LIFTING THE BOILER
Lift boiler on to its mounting bracket and centralise it by aligning the notch in t
he heat shield at the bottom of boiler with the reference line on wall.
Correct vertical alignment with the rear wall as necessary using the adjustmen
t screws fitted to the boiler legs. When adjustment is complete, rotate the adju
stment screwssufficiently to align the hole in the base plate with hole
‘B’ in the
wall. Secure boiler to wall using the screws from accessory pack B.
Undo the two nuts securing the front transportation foot.
Discard foot and nuts.
Make the flue connection to the boiler draught diverter sealing the joint with a
suitable compound. Refer to the notes under FLUE
page 7
.
The weight of the flue must be supported independently, NOT by the boiler. R
emove the case support plate from its transportation position on the fluehood
and re-position itas shown in
FIG. 9
.
FIG. 9. LIFTING BOILER
CONNECTING SYSTEM PIPEWORK
The threaded steel tubes and elbow attached to the boiler when supplied have
been factory sealed and water tested.
Содержание CF 20/35
Страница 4: ......
Страница 5: ...Page 4 INSTALLATION DATA Page 5 FIG 2 GENERAL ARRANGEMENT...
Страница 6: ...Page 5...
Страница 17: ...FIG 4 OPEN VENTED FULLY PUMPED SYSTEM FITTED WITH A COMBIN ED FEED AND VENT Page 10 TECHNICAL DATA Page 11...
Страница 18: ...FIG 5 FULLY PUMPED SEALED SYSTEM FIG 6 OPEN VENTED GRAVITY DOMESTIC HOT WATER AND PUMPED CENTRAL HEATING SYSTEM...
Страница 43: ...Page 25...