Figure 51. Terminating a debug session
6. Check that the program executes properly by rotating the board’s potentiometer and pressing SW1 or SW2 to see
changes in the LCD on the board and in the board LEDs that correspond to the charging state of the vehicle.
Figure 52. Testing the KM3x board
If the board works as expected, unplug the debug cable.
7.4 OM-SE050ARD setup
Even though Edge Lock SE050 is not used in this initial simplified setup, it is recommended to prepare the board with the jumper
setup shown in
. This setup prevents you from having to disassemble the boards when using the SE050, as shown in
the
EV Charging Station Development Platform User Manual
.
1. Set J6 to position 1-2 and J7 to position 2-3. This disconnects the unused antenna of the module and prevents
interference with the CLEV663ARD antenna.
2. Set J37 and J38 to close. This enables the 560-Ω parallel pull-up resistor for the I2C high-speed mode.
NXP Semiconductors
Board setup, wiring, and assembly
NXP EasyEVSE EV Charging Station Development Platform User Guide, Rev. 0, 18 March 2022
User Guide
38 / 64