
Maintenance
98
89217391 Rev. A
©2022 nVent
No.
Component
Maintenance job
Maintenance
interval
4
Plates/labels
Check that the labels and symbols on the unit are
complete and legible. Missing or illegible labels/symbols
must be replaced.
Annually
5
Unit
Check the connecting lines inside the unit for signs of
damage. Replace them, if necessary.
6
Pump
Check whether the pump exhibits any unusual noise.
Check the system parameters.
Follow the instructions that are given in the
"Troubleshooting" section.
Annually
Check the circuit breakers. See the "Maintenance/Circuit
breakers" chapter.
7
Control valve
Check for correct operation.
Annually
8
Shut-off
valves/butterfly valves
Functional test.
Check whether the positions are correct and in line with
the schematic system diagram (shut-off valves = SOV;
butterfly valves = BV).
9
Electrical
connections/wiring
Check for proper connection.
Check the cables for signs of damage.
10
Sensors (temperature
sensors and pressure
sensors etc.)
Visual inspection.
Check the cables for signs of damage.
Clean if necessary.