OPI-POWER LIFT HF 3S 12000-V1.0-EN
3
1
General informations .......................................5
1.1 Lift purpose ................................................................ 5
1.2 Liability ........................................................................ 5
1.3 Owner/Employer responsibilities ............................. 5
1.4 Lift operator responsibilities ...................................... 6
1.5 Safety regulations ..................................................... 6
1.6 Safety devices ........................................................... 7
1.7 Safety labels affixed to lift
........................................ 8
1.8 Protocols .................................................................... 9
1.9 Set up and test the lift .............................................. 9
Set up protocol .................................................................. 10
Transfer protocol ............................................................... 11
2
System master sheet ......................................12
2.1 Manufacturer .......................................................... 12
2.2 Purpose .................................................................... 12
2.3 Changes to the design / construction ................. 12
2.4 Changing the assembly location ......................... 12
3
Technical information ....................................13
3.1 Technical data ....................................................... 13
3.2 Sicherheitseinrichtungen ........................................ 13
3.3 Data sheet .............................................................. 14
3.4 Hydraulic plan ......................................................... 16
3.5 Hydraulic connection plan .................................... 17
3.6 Electrical circuit diagram ....................................... 18
4 Installation .......................................................24
5
Operating manual ..........................................24
5.1 Positioning the vehicle ........................................... 25
5.2 Lifting the vehicle .................................................... 25
5.3 Lift synchronization .................................................. 25
5.4 Lowering the vehicle .............................................. 26
6
Behaviour in cases of error ............................26
6.1 Emergency discharge ............................................ 26
6.2 Moving onto an obstacle ...................................... 27
7
Maintenance and care of the system ..........28
7.1 System maintenance plan .................................... 29
7.2 Cleaning and care of the lift ................................. 34
8
Assembly and commissioning ......................34
8.1 Set up guidelines ..................................................... 34
8.2 Lifting arm assembly ............................................... 37
8.3 Lifting arm alignment .............................................. 37
8.4 Commissioning ........................................................ 38
8.5 Changing the assembly location ......................... 38
8.6 Selection of anchors ............................................... 39
9
Safety inspection ............................................40
9.1 Single safety inspection before commissioning .. 41
9.2 Regular safety inspection and maintenance ..... 42
Spare parts list
53
Содержание HF 3S 12000
Страница 2: ...2 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 4: ......
Страница 19: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 19 ...
Страница 20: ...20 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 21: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 21 ...
Страница 22: ...22 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 53: ...Made in Germany POWER LIFT HF 3S 12000 Made in Germany Spare parts list ...
Страница 60: ...60 OPI POWER LIFT HF 3S 12000 V1 0 EN 60 xx Switch box 000STA03600 2 05 07 19 ...