30
OPI-POWER LIFT HF 3S 12000-V1.0-EN
Time frame
Maintenance
type position
Person in
charge
Maintenance plan
As required
Lift owner /
employer
The lift cylinder can sweat and small oil droplets can
form on the base plate, this is however, not a leak.
Daily
1
12
11
10
9
8
7 6 5
4
3
2
365 x / 12
Lift owner /
employer
Model and information signs, labels, brief operating
instructions, safety stickers and warning information
are to be cleaned and exchanged if damaged.
Daily
1
12
11
10
9
8
7 6 5
4
3
2
365 x / 12
B
Lift owner /
employer
The rubber acceptance plate is to be checked for
wear and replaced if necessary.
Daily
1
12
11
10
9
8
7 6 5
4
3
2
365 x / 12
Optional: Check the CE stop and warning signal for
condition and function. Exchange if damaged.
The CE stop must switch a min. of 120 mm from the
hazard.
Daily
1
12
11
10
9
8
7 6 5
4
3
2
365 x / 12
During assembly and maintenance always check the
condition of electrical lines. All cables and lines must
be secured so they cannot be crushed, kinked or con-
tact any moving assembly.
Semi-annual
1
12
11
10
9
8
7 6 5
4
3
2
2 x / 12
C
Lift owner /
employer
Check the tracks and the lift rail equalization parts
for wear. After cleaning, grease with a multi-purpose
grease.
Annually
1
12
11
10
9
8
7 6 5
4
3
2
1 x / 12
D
Trained ser-
vice personnel
Check the lifting arm block and gear for wear.
Exchange both components if there is visible damage.
Содержание HF 3S 12000
Страница 2: ...2 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 4: ......
Страница 19: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 19 ...
Страница 20: ...20 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 21: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 21 ...
Страница 22: ...22 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 53: ...Made in Germany POWER LIFT HF 3S 12000 Made in Germany Spare parts list ...
Страница 60: ...60 OPI POWER LIFT HF 3S 12000 V1 0 EN 60 xx Switch box 000STA03600 2 05 07 19 ...