OPI-POWER LIFT HF 3S 12000-V1.0-EN
29
7.1 System maintenance plan
i
Before beginning service, disconnect from power. The system is to be secured against unintentional
lowering and unauthorized access.
During assembly and maintenance always check the condition of electrical lines. All cables and lines
must be secured so they cannot be crushed, kinked or contact any moving assembly.
Visual in-
spection
Spray
Oil
Lubricate
Clean with
compressed
air
Clean
Inspect
A
B
H
G
F
E
D
C
D
Содержание HF 3S 12000
Страница 2: ...2 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 4: ......
Страница 19: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 19 ...
Страница 20: ...20 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 21: ...OPI POWER LIFT HF 3S 12000 V1 0 EN 21 ...
Страница 22: ...22 OPI POWER LIFT HF 3S 12000 V1 0 EN ...
Страница 53: ...Made in Germany POWER LIFT HF 3S 12000 Made in Germany Spare parts list ...
Страница 60: ...60 OPI POWER LIFT HF 3S 12000 V1 0 EN 60 xx Switch box 000STA03600 2 05 07 19 ...