Operating Instruction and Documentation
4.40 ND
- 20 -
9. Handing over and Initiation
9.1 Regulations
• The installation of the lift is performed by trained technicians of the manufacturer or one of its
distribution partners. If the operator can provide trained mechanics, he can install the lift by
himself. The installation has to be done according to this regulation.
• Installing the standard-automotive lift in a hazardous location or a washing bay is not
allowed.
• Before installation a sufficient foundation must be constructed. If the foundation is already
constructed then proof that the foundation conforms to the standard is required.
A level foundation for the installation is required. The foundations must be based in a frost
resistance depth, both outdoors and indoors in a position where the installer believes there is
no chance of frost.
• An electrical supply 3~/N+PE, 400 V, 50 Hz must be provided.
The supply line must be protected with a time-lag fuse T16Ampere (VDE0100 German
regulation). The minimum diameter amounts to 2.5 mm².
• All cable ducts must be equipped with protective coverings to prevent accidents.
• After assembly of the lift, the protective grounding of the lift must be examined after
International Electronical Commission (IEC) guidelines (60364-6-61) before first start-up by
operators. Also an insulation resistance examination is recommended.
9.2 Erection and doweling of the lift
It is necessary to dowel every columns at 4 points. For this a concrete floor without
reinforcement, thickness of min.160 mm and quality C20/25 (B25) and a normal armouring is
needed. In case of doubt a test drill is necessary and a dowel is to put in. Afterwards the dowels
(anchor) (German Dowel manufacturer) are to fasten with a demand torque moment. If the
necessary torque is too low or if there are cracks in the concrete floor, a foundation in
accordance with the sheet ”foundation plan” is to erected. As well it must be paid attention that
the installation place is even to guarantee a horizontal erection of the lift.
• Put runways on two erection trestles at installation place, pay attention of exactly
difference between the runways (refer to data sheet)
• Position the Traverses on the face of the runways, and put the plugs together.
• Lay out the ropes into right position (see Pic.)
• Fasten the crossbeam at the rail. Connect the plugs (optional: lighting, CE-Stop switch).
• Pull the ropes through the crossbeam.
• Pull cables (power supply, electrical cable etc.) through the crossbeam and connect.
• Position the columns at the end of the crossbeams.
Содержание 4.40 ND
Страница 9: ...Operating Instruction and Documentation 4 40 ND 9 2 5 Declaration of conformity...
Страница 11: ...Operating Instruction and Documentation 4 40 ND 11 3 3 Data sheet...
Страница 38: ...Operating Instruction and Documentation 4 40 ND 38 Electrical diagram drawing Standard Version...
Страница 39: ...Operating Instruction and Documentation 4 40 ND 39...
Страница 40: ...Operating Instruction and Documentation 4 40 ND 40 Since 11 2009 Motor 1 5 kW 991033...
Страница 41: ...Operating Instruction and Documentation 4 40 ND 41...
Страница 42: ...Operating Instruction and Documentation 4 40 ND 42...
Страница 43: ...Operating Instruction and Documentation 4 40 ND 43 Electrical diagram drawing Version India...
Страница 44: ...Operating Instruction and Documentation 4 40 ND 44...
Страница 45: ...Operating Instruction and Documentation 4 40 ND 45...
Страница 46: ...Operating Instruction and Documentation 4 40 ND 46...
Страница 47: ...Operating Instruction and Documentation 4 40 ND 47...
Страница 48: ...Operating Instruction and Documentation 4 40 ND 48 Spare Parts List...
Страница 49: ...Operating Instruction and Documentation 4 40 ND 49 Since 11 09 1 5kW 991033...
Страница 50: ...Operating Instruction and Documentation 4 40 ND 50...
Страница 51: ...Operating Instruction and Documentation 4 40 ND 51...
Страница 52: ...Operating Instruction and Documentation 4 40 ND 52...
Страница 53: ...Operating Instruction and Documentation 4 40 ND 53...
Страница 54: ...Operating Instruction and Documentation 4 40 ND 54 Haupt schalter 990403 Taster 990130...
Страница 55: ...Operating Instruction and Documentation 4 40 ND 55...
Страница 56: ...Operating Instruction and Documentation 4 40 ND 56...
Страница 57: ...Operating Instruction and Documentation 4 40 ND 57...
Страница 58: ...Operating Instruction and Documentation 4 40 ND 58...
Страница 59: ...Operating Instruction and Documentation 4 40 ND 59...
Страница 60: ...Operating Instruction and Documentation 4 40 ND 60...
Страница 61: ...Operating Instruction and Documentation 4 40 ND 61...
Страница 62: ...Operating Instruction and Documentation 4 40 ND 62...
Страница 63: ...Operating Instruction and Documentation 4 40 ND 63...
Страница 64: ...Operating Instruction and Documentation 4 40 ND 64...