Operating Instruction and Documentation
2.30 SL E
- 25 -
After the construction of the lift has been changed (changing the lifting
height or capacity for example) and after serious maintenance works
(welding on carrying parts) an extraordinary security check must be
performed by an expert.
This manual contains form with a schedule for the security checks. Please us the
adequate form for the security checks. The form should remain in this manual after
they have been filled out. In the following there is a short description about special
safety devices.
Содержание 2.30 SL E
Страница 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Страница 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Страница 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Страница 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Страница 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...