Operating Instruction and Documentation
2.30 SL E
- 22 -
• Tighten the dowels with the dynamometric key (example: Liebig-dowel 80 Nm).
Each dowel must be tightened with the demanded torque. Otherwise the normal
function of the lift can not guaranteed.
• If you need the cable not under the floor mount the traverse and the ascending pipe.
Secure the traverse against falling out. Do not hang any additional loads on the
traverse and the ascending pipe. (for an example: a ladder)
8.1.2 Electro mounting and current connection
A) with using traverse and ascending pipe
• Remove the cover at the top of the column.
• Lay the cable after the drawing (pic.17) in the ascending pipe and the traverse. Put
the correct plugs together.
Observe the secure contact between the plugs.
Plug in the 7-wire motor cable (with 2 plugs) in the head plate of the operating
column. Lay this cable over the ascending pipe and the traverse to the head plate of
the opposite side. Plug in the plug in the head plate of the opposite side.
Plug in the 3-wire potentiometer cable (with 2 plugs) in the head plate of the opposite
side. Lay this cable over the ascending pipe and the traverse to the head plate of the
opposite side. Plug in the plug in the head plate of the opposite side.
The 5-wire cable (with one plug) is for the main supply. Plug in the plug at the head
plate of the operating column.
• Push the cover sheets careful in the ascending pipe.
pic.17 cable run with traverse and ascending pipe
Содержание 2.30 SL E
Страница 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Страница 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Страница 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Страница 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Страница 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...