Operating Instruction and Documentation
2.30 SL E
- 16 -
Put the device on a solid flat surface. Push it down until the pin is on the flat surface
too. Put the clock on zero – turn the ring of the clock so long until the indicators are on
zero. Put the device on the V- belt (pic.8, 9). The indicator of the clock may only turn
mini. 1 (1mm) until 1,5 (1,5mm) turn.
Pic.8: measuring instrument
Pic.9: Put the measuring device on the V-belt
•
Bring the screws back in initial position.
6.3 Check the carrying nut system
•
carrying nut (optical wearing device). To check the carrying nut, take off the
covering of the spindle (pic.3,pos.b). There is a pin built in the carrying plate
(pic.10). This pin must be even with the top edge of the carrying plate (upper side of
the lifting carriage; built-in state pic.11). If the pin looks 2 mm out of the top edge at
the annually check (pic.11 changing state). The carrying nut and the sequence nut
must be replaced.
Pic.10: the carrying-nut pin (stift)
Содержание 2.30 SL E
Страница 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Страница 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Страница 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Страница 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Страница 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...