Operating Instruction and Documentation
2.30 SL E
- 21 -
pic.12: complete view: automotive lift with ascending pipe and traverse.
A foundation must be constructed in accordance with the data sheet “foundation plan”.
It must be paid attention of an even installation place of the lift because of a straight
contact between lift and concrete floor.
pic.13: doweling
1: column
2: base plate
3: dowel
• As protection against liquids, should before doweling put a thin foil between the base
plate and the concrete.
• Close after this the split between the base plate and the concrete with silicone.
• Bore holes to fix the dowels through the borings of the base plates (pic.13). Clean the
holes with pressure air. Put in the dowels. The lift manufacturer demands Liebig
safety dowels type B20 or equaly good dowels of other manufacturer (with licence)
but observe the regulation. (bore hole, torque...). Before doweling check the concrete
floor with quality B25 if the concrete floor goes to the top egde of the floor. In this
case the dowels have to be chosen according to pic.22. If the ground is covered with
floor tiles, the dowels have to be chosen according to pic.21.
• Lining up the column with spirit level.
• If necessary put thin metal sheets between the base plate and the floor until the lift is
in the correct vertical position and the contact between the base plate and the floor is
available.
Содержание 2.30 SL E
Страница 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Страница 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Страница 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Страница 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Страница 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...