background image

 

 

      

  2.30 SL E  

Automotive Lift date: 10-2000 

 

Manual date: 06.10.2000 
Version: electronic 

 

 

Operating Instruction and Documentation 

 

Serial-number:........................................................ 

 
 
 

 
 
 
 
 

Nußbaum Hebetechnik GmbH & Co.KG//Korker Strasse 24//D-77694 Kehl-Bodersweier//Tel: +49(0)7853/8990 

Fax: +49(0)7853/8787//E-mail: [email protected]//http://www.nussbaum-lifts.de

Retailer address /Phone 

Содержание 2.30 SL E

Страница 1: ...ersion electronic Operating Instruction and Documentation Serial number Nu baum Hebetechnik GmbH Co KG Korker Strasse 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 7853 8787 E mail info nuss...

Страница 2: ...onto an obstacle 18 7 3 Function of safety device 18 7 4 Manually equalisation of the lifting carriage 19 7 5 Adjusting of the Limit switch 19 8 Installation and Initiation 20 8 1 Installation of the...

Страница 3: ...lift Especially the chapter Safety accident Prevention has to be observed In addition to the safety remarks of the instructions for use the regulations and instructions being valid at the place of op...

Страница 4: ...ns personal protective equipment is to be used All safety and danger hints at the lift are to be observed Spare parts must comply with technical requirements laid down by the manufacturer This is only...

Страница 5: ...They are called experts and competent person in this document Experts are persons for example self employed engineers experts which have received instruction and have experience to check and to test...

Страница 6: ...construction and after repair the lift has to be checked by an expert again The operating instruction and the instruction for maintenance have to be observed Changes at the construction repairs and t...

Страница 7: ...mentation 2 30 SL E 7 2 5 CE Certificate attestation of conformity The automotive lift 2 30 SL E with the serial number Is in accordance with the tested lift CE certificate number 04 205 2563 96 place...

Страница 8: ...ing time approx 40 sec Lifting height max 1870 mm Line voltage 3 x 400 three phase current Power rating 2 x 1 5 kW Motor speed 1420 rotation speed Sound level 75 dB A Connection by customer Fuse T16 A...

Страница 9: ...t During lifting or lowering the vehicle it must be observed from the operator Position the pads as described of the vehicle manufacturer under the vehicle Observe the complete lifting and lowering Sw...

Страница 10: ...ion the pads under the described points of the vehicle The fixing device of the arms must lock Check the pick up points if the lift is repeatedly lowering in the lowest position Control the dangerous...

Страница 11: ...ng Check the fixing device of the arms The device must lock pic 2 the changing switch 5 4 Lowering the vehicle Control the dangerous places of the lift and be sure that there are no objects or people...

Страница 12: ...w limit switch is active master side OA2 LED red top limit switch is active slave side K2 LED green Motor contactor is active slave side UA2 LED red below limit switch is active slave side Heben LED g...

Страница 13: ...Operating Instruction and Documentation 2 30 SL E 13...

Страница 14: ...e lifting and lowering the lift in the end position After lifting and lowering the lift with load The lubricating interval has to be carried out at every maintenance If the lift is in continuous opera...

Страница 15: ...ing pipe 1 column 2 raising pipe 3 cover of the belt 4 spindle The new belt tension must be adjusted at the stretch device pic 5 Loose the three screws at the motor easily pic 6 No 1 The belt can be l...

Страница 16: ...ic 9 Put the measuring device on the V belt Bring the screws back in initial position 6 3 Check the carrying nut system carrying nut optical wearing device To check the carrying nut take off the cover...

Страница 17: ...devices of the lift as well as repairs and examinations of the electrical fittings are forbidden Problem The lift does not lifting and not lowering possible causes remedying the main switch is not swi...

Страница 18: ...e the motor from this side locked The lift switched off if the lifting carriage are not more in the regulation range approx 25 30 mm since 9 99 64 mm An additional protection is a temperature control...

Страница 19: ...the V Belt pulley at the top of the lift Equal the lift turn one nut until the carriage have the same height 7 5 Adjusting of the top limit switch and the bottom limit switch The operating unit of the...

Страница 20: ...The installation has to be done according to this regulation The standard lift must not be installed in hazardous locations or washing areas Before installation a sufficient foundation must be proved...

Страница 21: ...holes to fix the dowels through the borings of the base plates pic 13 Clean the holes with pressure air Put in the dowels The lift manufacturer demands Liebig safety dowels type B20 or equaly good dow...

Страница 22: ...ng pic 17 in the ascending pipe and the traverse Put the correct plugs together Observe the secure contact between the plugs Plug in the 7 wire motor cable with 2 plugs in the head plate of the operat...

Страница 23: ...h the hole in the base plate to the head plate of the column Build the column Pay attention the cables Connect the cables Plugs in accordance with the drawing pic 19 Pay attention the cables does not...

Страница 24: ...dium height Take away current supply from the lift Remove the cover of the lift Dismount the carrying arms Disconnect the plugs If necessary remove the ascending pipe and the traverse Loosen the dowel...

Страница 25: ...us maintenance works welding on carrying parts an extraordinary security check must be performed by an expert This manual contains form with a schedule for the security checks Please us the adequate f...

Страница 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...

Страница 27: ...Operating Instruction and Documentation 2 30 SL E 27...

Страница 28: ...Operating Instruction and Documentation 2 30 SL E 28 Foundation plan Version with traverse and ascending pipe 3400...

Страница 29: ...Operating Instruction and Documentation 2 30 SL E 29 Foundation plan Version without traverse and ascending pipe 3400...

Страница 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...

Страница 31: ...ence Drilling depth a according to dowel manufacturer Min anchorage depth b 100 mm 80 mm for version with base frame bow Thickness of concrete c at least 200 mm or at least 150 mm for version with bas...

Страница 32: ...er manufacturer with licence Drilling depth a according to dowel manufacturer Min anchorage depth b 100 mm 80 mm for version with base frame bow Thickness of concrete c at least 200 mm or at least 150...

Страница 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...

Страница 34: ...rmo switch in the motor F02 Thermo switch in the motor K1 up contactor K2 up contactor M1 Motor 400V 1420 U min 1 5 kW master side M2 Motor 400V 1420 U min 1 5 kW opposite side W1 reversing switch St...

Страница 35: ...stalled on at the firm at the safety was checked and the lift was started The installation was effected from the operating authority competent please delete as applicable The safety of the automotive...

Страница 36: ...s started The persons below were introduced after the installation of the automotive lift The introduction was carried out from an erector of the lift manufacturer or from a franchised dealer competen...

Страница 37: ...e and carrying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F...

Страница 38: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 39: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 40: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 41: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 42: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 43: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 44: ...rying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Condi...

Страница 45: ...carrying nut F F F Condition coverings F F F Function equalisation F F F Condition electrical wiring F F F Condition bolts F F F Fixing device of carrying arms F F F Condition foot protection F F F Co...

Отзывы: