OM0239
Page 54 of 72
April 2021
7.10 Main Control Board Description and Replacement
To access the main control board for fuse or board replacement, remove screws at each upper side of the control center
and allow the control center to rotate down, resting on the safety straps. Now the main control board is exposed for
service.
7.10.1 Main Control Board Replacement
The main control board consists of one Printed Circuit Board (PCB) assembly.
The PCB contains the power supply, configuration switch, sensor inputs/outputs and control inputs/outputs
components and display.
7.10.2 Main Control Board Fuse Replacement
Disconnect electrical power from cabinet before fuse replacement.
All AC circuits are fuse protected and when replacement is necessary, USE ONLY FUSES OF SAME TYPE AND RATING
FOR PROTECTION AGAINST RISK OF FIRE.
DESCRIPTION:
BLOWER FUSE
OUTLET FUSE
ACCESSORY
OUTPUT FUSE
LIGHT FUSE
FUSE TYPE:
TIME-LAG
TIME-LAG
TIME-LAG
TIME-LAG
FUSE SIZE:
1/4 X 1-1/4 INCH
5 X 20MM
5 X 20MM
5 X 20MM
NU-543-300S
6.25 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-400S
8 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-500S
10 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-600S
10 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
7.10.3 Main Control Board Replacement
Note: All setup and calibration data will be lost, the memory reinitialized to the default values and all control
functions reset to an initial cabinet power condition.
If possible, before the main control board replacement, it would be preferred to know the operational
parameters of the cabinet, (i.e. blower speed/PWM signal DC voltage setpoints if modified and airflow data
from previous certification).
Disconnect electrical power from the cabinet before attempting any
maintenance action.
The main control board is fastened to the control center with (6) 6-32 studs/nuts. All electrical connections are
made with removable terminals and/or Faston connectors except for the motor/blower connector which uses a
screw terminal. Remove all electrical connections and fasteners and then remove the main control board from the
control center.
Install new main control board by reattaching all electrical connections and fasteners. Once installed, rotate
control center to normal position and fasten in place.
Reconnect power to cabinet.
CAUTION
!
CAUTION
!
Содержание LabGard ES NU-543-300S
Страница 7: ...OM0239 Page 7 of 72 April 2021 ...
Страница 9: ...OM0239 Page 9 of 72 April 2021 ...
Страница 10: ...OM0239 Page 10 of 72 April 2021 ...
Страница 11: ...OM0239 Page 11 of 72 April 2021 ...
Страница 12: ...OM0239 Page 12 of 72 April 2021 ...
Страница 16: ...OM0239 Page 16 of 72 April 2021 ...
Страница 21: ...OM0239 Page 21 of 72 April 2021 ...
Страница 35: ...OM0239 Page 35 of 72 April 2021 ...
Страница 67: ...OM0239 Page 67 of 72 April 2021 ...
Страница 68: ...OM0239 Page 68 of 72 April 2021 ...
Страница 69: ...OM0239 Page 69 of 72 April 2021 ...
Страница 70: ...OM0239 Page 70 of 72 April 2021 ...
Страница 71: ...OM0239 Page 71 of 72 April 2021 ...
Страница 72: ...OM0239 Page 72 of 72 April 2021 ...