Lx Series Installation and Operation Instructions
│
Trinity Lx
9
Figure 3-1(a) Closet Installation, Minimum Clearances (Lx150-200)
Figure 3-1(b) Closet Installation, Minimum Clearances (Lx300-400)
Closet/alcove installations in US and Canada require approved
CPVC
vent and air-inlet
pipe, fittings, cements and primers (Table 4-3).
Ventilation Air Openings
are not required if the
appliance area meets
the listed Recommended
Clearances in Table 3-1.
Top
12” [305 mm]
Removable Surface or Closet Door
Ventilation Air Opening
1 in
2
per 1000 Btu/hr, min. 100 in
2
Ventilation Air Opening
1 in
2
per 1000 Btu/hr, min. 100 in
2
6” [152 mm] max. above vent opening
6” [152 mm] max. below vent opening
Right Side 4
” [102 mm]
Left Side 12
” [305 mm]
Front 6
” [152 mm]
Piping must be CPVC
1” [25 mm] clearance for
hot water and vent pipes
Removable Surface or Closet Door
Ventilation Air Openings
are not required if the
appliance area meets
the listed Recommended
Clearances in Table 3-1.
Top
12” [305 mm]
6” [152 mm] max. above vent opening
Front 6
” [152 mm]
Left Side 12” [305 mm]
Right Side 12” [305 mm]
6” [152 mm] max. below vent opening
Ventilation Air Opening
1 in
2
per 1000 Btu/hr, min. 100 in
2
Ventilation Air Opening
1 in
2
per 1000 Btu/hr, min. 100 in
2
Piping must be CPVC
1” [25 mm] clearance for
hot water and vent pipes
Содержание Trinity Lx 150
Страница 61: ...Lx Series Installation and Operation Instructions Trinity Lx 61 Figure 13 1 b Ladder Logic Diagram Lx150 400...
Страница 62: ...Trinity Lx Installation and Operation Instructions Lx Series 62 Figure 13 2 a Connection Diagram Lx500 800...
Страница 63: ...Lx Series Installation and Operation Instructions Trinity Lx 63 Figure 13 2 b Ladder Logic Diagram Lx500 800...
Страница 103: ...Lx Series Installation and Operation Instructions Trinity Lx 103 NOTES...