Boiler and Heating System Piping
│
FTV I&O Manual
40
Near Boiler Piping (Central Heating
– CH)
Figure 10-2(a) Top (All Models)
Figure 10-2(b) Bottom (non-Combi)
Figure 10-2(c) Bottom (Combi – Option A)
Figure 10-2(d) Bottom (Combi – Option B)
Boiler Outlet
Pressure &
Temperature Gauge
(factory supplied)
Tee Fitting - Typical
(field supplied)
Boiler Inlet
30 PSI Relief Valve
(factory supplied)
Auto Air Vent
(factory supplied)
¾ in. Brass Street Elbow
(factory supplied)
¾ x ½ x ¾ in. Brass Tee
(factory supplied)
Pressure &
Temperature Gauge
(factory supplied)
Tee Fitting - Typical
(field supplied)
Boiler Outlet
Boiler Inlet
Gaskets
– p/n 82368
(needed w. LL Header)
Pressure &
Temperature Gauge
(factory supplied)
Low Loss Header
–
p/n 85110
(optional)
Heating Supply
Heating Return