FTV I&O Manual
│
General Venting
15
Figure 4-3(a) FTV150-190(C)
Figure 4-3(b) FTV150-190(C)
Near Boiler Venting (PVC)
Near Boiler Venting (CPVC)
Figure 4-3(c) FTV150-190(C)
Figure 4-3(d) FTV150-190(C)
Near Boiler Venting (PP)
Near Boiler Venting (SS)
Air-inlet
- check with applicable local codes for acceptable pipe material.
Swing Joint
to attain slope in
horizontal runs
CPVC Transition Pipe
**minimum 5” long
(factory supplied)
Flue Outlet
Adapter
(factory supplied)
**CPVC Transition Pipe
is mandatory when
venting with PVC
PVC Coupling
Air-inlet Adapter
(factory supplied)
PVC Air-inlet Pipe*
PVC Exhaust Vent
PP Elbow
w.
offset angle to
account for slope
Flue Outlet
Adapter
(factory supplied)
Air-inlet Adapter
(factory supplied)
PP Air-inlet Pipe*
PP Exhaust Vent
Swing Joint
to attain slope in
horizontal runs
Flue Outlet
Adapter
(factory supplied)
Air-inlet Adapter
(factory supplied)
SS Air-inlet Pipe
SS Exhaust Vent
Swing Joint
to attain slope in
horizontal runs
Flue Outlet
Adapter
(factory supplied)
Air-inlet Adapter
(factory supplied)
PVC Air-inlet Pipe*
CPVC Exhaust Vent