FTV I&O Manual
│
General Venting
21
Sidewall Termination Details
– Direct Vent Installation
Figure 4-6 (a) Two-Pipe Termination (Sidewall)
Figure 4-6 (b) IPEX Concentric Termination
(Sidewall)
Refer to documentation included with termination kit for
complete installation instructions.
Figure 4-6 (c) Low Profile Termination (Sidewall)
Figure 4-6 (d) PolyPro / InnoFlue Termination
(Sidewall)
Refer to documentation included with termination kit for
complete installation instructions.
Min. 12”
above grade
or snow level
Exhaust
Air-inlet
Exhaust
Air-inlet around
perimeter
Min. 12”
above grade
or snow level
Exhaust center
Air-inlet bottom
Exhaust
Air-inlet
Gas Vent Directly Below
Keep Free of Obstructions
Refer to documentation included with termination kit for
complete installation instructions.
Exhaust
Air-inlet
Min. 12”
above grade
or snow level
Vertical
Min. 18”
Horizontal
4-
12” or greater
than 36”
Exhaust
Air-inlet
Vent Screen
Vent pipe piece to
retain vent screen
Gas Vent Directly Below
Keep Free of Obstructions
Exhaust
Air-inlet
Min. 12”
above grade
or snow level
Air-inlet around
perimeter (1-
2”
from wall)
Exhaust through
center
Vent Screen
Vent pipe piece to
retain vent screen