10 Communication
PCS-978 Transformer Relay
10-9
Date: 2013-01-16
Client
IED (Server)
Report Control Block
Report Instance 1
RptEna = true
Net A
Net B
Client
IED (Server)
Report Control Block
Report Instance 1
RptEna = true
Net A
Net B
TCP Link
MMS Link
Normal operation status
Abnormal operation status
Figure 10.5-1 Dual-net full duplex mode sharing the RCB block instance
Net A and Net B share the same report control block (abbreviated as RCB) enabled by the client.
IED sends undifferentiated date through dual-net to the clients. If one net is physically
disconnected, the flag of RCB instance (i.e.:
“RptEna” in above figure) is still “true”. Only when
both Net A and Net B are disconnected, the flag of the RCB instance will automatically change to
“false”.
In normal operation status of mode 1, IED provides the same MMS service for Net A and Net B. If
one net is physically disconnected (i.e.:
“Abnormal operation status” in above figure), the working
mode will switch to single-net mode seamlessly and immediately. Network communication
supervision is unnecessary here, and Buffered Report Control Block (abbreviated as BRCB) need
not to be used. On the other net, date alternation works normally. Therefore, MMS service can
interact normally without interruption. This mode ensures no data loss during one net is in
abnormal operation status.
In mode 1, one report will be transmitted twice via dual nets for the same report instance, so the
client needs to distinguish whether two reports are same according to corresponding EntryIDs.
2) Mode 2: Dual-net hot-standby mode sharing the same RCB instance
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...