3 Operation Theory
PCS-978 Transformer Relay
3-173
Date: 2013-01-16
3.22.5 Inputs and Outputs
59GAlm
U1P
En1
En2
Blk
Alm
U3P
St
Figure 3.22-2 Function block 59GAlm
Table 3.22-1 Input signals of 59GAlm
No.
Signal
Description
1
U3P
Three phase voltage data, including calculated residual voltage.
2
U1P
Measured residual voltage data
3
En1
Function enabling input1 and input 2, it can be binary inputs or settings, such as
function enabling binary inputs, logic links, etc.
4
En2
5
Blk
Function blocking input, such as function blocking binary input.
If the input is 1, the protection is not reset and time delay will be cleared.
Table 3.22-2 Output signals of 59GAlm
No.
Signal
Description
1
Alm
Alarm element operates.
2
St
Alarm element starts
Above input signals and output signals can be used for programmable logic, and following output
signals are only for LCD display of equipment.
NOTE!
Symbol ”
x
” represents some side of transformer defined by user through
PCS-Explorer
software, which may be “H”, “HV” “HVS”, “HVS1”,” HVS2”, etc. If only one
protection element is equipped, the prefix “x.” may disappear.
Table 3.22-3 Output signals of 59G: report
No.
Signal
Description
1 x.59GAlm.Alm
Residual overvoltage alarm element of x side operates.
Alarm reports of protection element.
2 x.59GAlm.St
Residual overvoltage alarm element of x side starts.
Start signals of protection element.
3.22.6 Settings
Table 3.22-4 Setting list of 59G
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...