
3
Operation
Theory
PCS-978 Transformer Relay
3-108
Date: 2013-01-16
Fault detector PSBR element (FD PSBR)
Unsymmetrical fault PSBR element (UF PSBR)
Symmetrical fault PSBR element (SF PSBR)
1. Fault detector PSBR element
If any of the following condition is matched, FD PSBR will operate for 160ms.
1) Positive-sequence overcurrent element does not operate (i.e.
moment that one of the fault detectors of impedance protection picks up.
I1<[21.I_OC_PSBR]
Equation 3.11-5
I1 is positive-sequence current.
[21.I_OC_PSBR] is the current setting of FD PSBR, which is set greater than maximum load
current.
2) Positive-sequence overcurrent element operates (i.e.
that one of the fault detectors of impedance protection picks up, but the duration of keeping
operating is less than 10ms.
I1>[21.I_OC_PSBR]
Equation 3.11-6
Where:
I1 and [21.I_OC_PSBR] please refer to above descriptions
2. Unsymmetrical fault PSBR element
The operation criterion:
1
2
0
I
m
I
I
Equation 3.11-7
Where
:
“m” is the internal fixed coefficient which can ensure UF PSBR operate during power swing with an
internal unsymmetrical fault, while not operate during power swing or power swing with an external
fault.
0
2
1
I
I
I
,
,
are positive-sequence current, negative-sequence current and zero-sequence current
respectively.
3. Symmetrical fault PSBR element
If a three-phase fault occurs and FD PSBR is invalid (160ms after fault detector operates), neither
FD PSBR nor UF PSBR will be able to operate to release the distance protection. Thus, SF PSBR
is provided for this case specially. This detection is based on measuring the voltage at power
swing center:
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...