3
Operation
Theory
PCS-978 Transformer Relay
3-176
Date: 2013-01-16
Table 3.23-2 Output signals of function block Curr3P
No.
Signal
Description
1
I3P
A current data set
2
Ang(Ia)
Phase angle of phase A current
3
Ang(Ib)
Phase angle of phase B current
4
Ang(Ic)
Phase angle of phase C current
5
AlmL_CTS
Alarm message of CT secondary circuit abnormality
6
AlmH_CTS
Alarm message of CT secondary circuit failure
7
OnLoad
A flag indicating there is load current detected
Above input signals and output signals can be used for programmable logic, and following output
signals are only for LCD display of equipment.
NOTE!
Symbol ”
x
” represents some side of transformer defined by user through
PCS-Explorer
software, which may be “H”, “HV” “HVS”, “HVS1”,” HVS2”, etc. If only one
protection element is equipped, the prefix “x.” may disappear.
Table 3.23-3 Output signals of Curr3P: report
No.
Signal
Description
1 x.AlmL_CTS
Current transformer circuit of x side is abnormal.
2 x.AlmH_CTS
Current transformer circuit of x side fails.
Alarm reports of equipment during operation.
Table 3.23-4 Output signals of Curr3P: measurements
No.
Signal
Description
1 x.Ua
Three-phase voltage values of x side.
2 x.Ub
3 x.Uc
4 x.3U0Cal
Calculated residual voltage value of x side.
5 x.U1
Positive-sequence voltage value of x side.
6 x.U2
Negative-sequence voltage value of x side.
7 x.Ang(Ua-Ub)
Angle between phase A and phase B voltages of x side.
8 x.Ang(Ub-Uc)
Angle between phase B and phase C voltages of x side.
9 x.Ang(Uc-Ua)
Angle between phase C and phase A voltages of x side.
10 x.3U0Ext
Measured residual voltage value of x side.
11 x.Ia
Three-phase current values of x side.
12 x.Ib
13 x.Ic
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...