Novatek-electro REV-114 Скачать руководство пользователя страница 3

- 3 - 

NOVATEK-ELECTRO 

                                                                                                                          

REV-114

 

 

This  Operation  Manual  is  intended  to  familiarize  you  with  arrangement,  the  requirements  for  safety,  operation  and 

maintenance procedures of the time delay relay REV

–114

 

(hereinafter referred to as the "product", "REV

–114"). 

The product meets the requirements of the following: 
IEC 60947-1 (Low-voltage switchgear; Part 1. General rules);  
ІEC  60947-6-2  (Low-voltage  circuit  breaker  and  controller;  Part  6-2;  multifunctional  equipment;  Control  and  safety 

switching equipment);  

CISPR 11 (Electromagnetic compatibility; Industrial, scientific and medical RF equipment; electromagnetic interference 

characteristics; standards and measuring procedure);  

IEC 61000-4-2 (Electromagnetic compatibility; Part 4-2; Testing and measurement techniques; Electrostatic discharge 

immunity test). 

Harmful substances in amounts exceeding maximum permissible concentrations are not available. 
 

Terms and abbreviations: 

 

It periodically flashes 

– the indicator short-time enabling. 

 

It periodically is off 

– the indicator short-time disabling. 

 

1. APPLICATION 
1.1. Product application 

The time delay relay REV-114 is the microprocessor-based device intended to control the load with independent time 

delay. It provides the certain sequence of the load operation according to the mode specified by the user. 

REV-114  is  equipped  with  control  buttons  and  a  digital  display  designed  for  adjustment  and  visual  check  of 

timing. 

REV-114 can be operated by seventeen operation algorithms: 

on-delay; 

 time delay when energizing;  

periodic with on-delay;  

periodic with time delay when energizing; 

pulse generator;  

on-delay with external start; 

off delay with external start;  

pulse I with external start;  

pulse II with external start;  

on/off delay with external start;  

pitch of the load relay (during each control contact closing);  

periodic with external start and on-delay;  

periodic with external start and time delay when energizing;  

pulse generator with external start;  

start stop;  

always ON; 

always OFF. 

 

1.2. Controls, overall and mounting dimensions of REV

–114 

Controls, overall and mounting dimensions are shown in Fig.1. 

 
 
 
 

1

 

– input contacts ~230/240 V 

N

L

– input control contact 

S

3

 

– digital indicator display; 

4

 

– button 

(UP); 

5

 

– button 

(DOWN); 

6

7

 

– output contacts of load relay  

         (

NO

C

NC

); 

8

 

– LED indicator of setup mode 

prg

9

 

– LED indicator of load relay ON 

10

 

– LED indicator of power ON 

On

 

 
 
 
 
 
 

Содержание REV-114

Страница 1: ...m of development and production production complies with the requirements of ISO 9001 2015 Dear Customer Company thanks you for purchasing our products You will be able to use properly the product aft...

Страница 2: ...OF THE CASE IT IS NOT ALLOWED WATER PENETRATION ON TERMINALS AND INTERNAL ELEMENTS OF THE PRODUCT During operation and maintenance the regulatory document requirements must be met namely Regulations...

Страница 3: ...e delay relay REV 114 is the microprocessor based device intended to control the load with independent time delay It provides the certain sequence of the load operation according to the mode specified...

Страница 4: ...17 Adjustment range of time from 0 1 s to 10 days Timing adjustment Buttons on the front panel Digit display of remaining time available Service of the product Switchgear and control gear Rated opera...

Страница 5: ...ed for set time and the indicator is on During the delay time the indicator periodically is off At the end of the delay time the load relay contacts are open and the product starts fulfillment of algo...

Страница 6: ...he indicator is off and the product goes into standby mode In case of repeated occurrence of the control signal S the algorithm fulfillment is repeated 8 Pulse I with external start After energizing t...

Страница 7: ...ith external start and on delay After energizing the indicator ON Fig 1 it 10 is on and the product goes into standby mode in this case the load relay contacts C and NO are open and the indicator Fig...

Страница 8: ...ts C and NO remain open and the indicator is off The product goes into the standby mode until power off 3 INTENDED USE 3 1 Preparation for operation Unpack the product we recommend to keep the origina...

Страница 9: ...nd wire can burn If you increase the tightening torque it is possible to have thread failure of the terminal block screws or the compression of the connected wire Error when performing the installatio...

Страница 10: ...is case the display will flash the current value of the selected time unit Using the buttons or set the required value Press the buttons one time to save the set value and return to the previous menu...

Страница 11: ...t should be packed in the original or other packing excluding mechanical damage You are kindly requested in case of return of the product and transfer it to the warranty post warranty service in the f...

Страница 12: ...12 REV 114 NOVATEK ELECTRO...

Отзывы: