Norton LEO 5710 Series Скачать руководство пользователя страница 13

BACKPLATE

REED SWITCH

CHAIN

INVERTER

MOTOR ASSEMBLY

Component Layout

Adjusting

Rod

Arm

Slide

Door

Shoe

Main
Arm

BACKPLATE

REED SWITCH

CHAIN

RF POWER SUPPLY
(Optional - For RF
Units Only)

“T1” POWER INPUT

TERMINAL (3-POSITION)

OPEN / CLOSE POSITION RINGS

PINION EXTENSION /
CLUTCH ASSEMBLY

1600 SERIES
CLOSER BODY

INVERTER

MOTOR ASSEMBLY

POWER SWITCH

Figure 2

Step 1:

Step 2:

Concealed Wired Units Only: Two (2)

NOTE:

two (2)

Step 3:

Step 4:

Concealed Wired Units Only:

Surface Wired Units Only:

Step 5:

Determine hand of door from illustration on Page 1.

Using template, (Page 2), locate and prepare holes in the

frame & door:

B.

7/8" (22mm) diameter

holes for conduit, for power input and for switch/sensor wires.

On new construction these holes will generally be

drilled by the frame supplier at their shop or at the time the
frame is installed in the wall.

C.

Prepare

holes for 3/8" diameter sex nuts. Standard

units are supplied with sex nuts and screws for 1-3/4"
(44mm) thick door. Sex nuts and screws for other door
thicknesses are available to order.

Remove cover from the unit and set cover & cover screws

aside.

Mount unit to door frame. Select A or B below.

A.

B.

Install main arm onto pinion shaft of unit at a 90° angle to

the door frame. Align arm mark “S” with the flat corner of
the pinion shaft square. (See Fig. 1, upper right.)

Frame

Door

A. Prepare

holes for 1/4-20 machine screws or

No. 14 x 2-3/4" (70mm) wood screws. Blind rivet nuts (by
others) are suggested for unreinforced hollow metal frames
or for aluminum frames.

six (6)

Connect conduit to frame

side of backplate. Fasten unit to door frame (six screws).

Fasten unit to door frame (six

screws). Mount conduit bracket (found in screw pack) to uni’t
backplate with two screws provided. Connect wiring conduit
to bracket.

Installation Sequence

Step 6: Secure main arm to pinion with 1/4-20 Flange Head

Screw provided. Tighten screw with 7/16" wrench or
socket.

Step 7:

Step 8:

Mount arm shoe to door using 2 1/4-20 screws & sex
nuts provided with screw pack.

PRELOAD ARM (See Fig. 2, below): Remove 1/4-20
hex head screw on adjusting rod and insert adjusting
rod into arm slide. Reinstall 1/4-20 screw and leave
loose. Rotate main arm in direction away from the hinge
edge until the adjusting rod and arm slide are
perpendicular (at a 90° angle) to the door frame. Tighten
the 1/4-20 hex head screw on the adjusting rod to
secure arm in this new position.

Left hand door shown
viewed from ceiling
looking down on unit.

R

L

Y

S

Z

Arm Mark

Pinion Flat

Figure 1

Component Layout

80-9357-0130-020 Rev. A

3

Adjusting

Rod

Arm

Slide

Door

Shoe

Main
Arm

MAIN ARM / SLIDE
UNIT ASSEMBLY

SHOE

SHOE / ADJUSTING

ROD

FOREARM
SCREW

BREAKER SWITCH

ACCESSORY
TERMINAL
(4-POSITION)

Содержание LEO 5710 Series

Страница 1: ...ctice in accordance with national and local wiring codes Note Unless otherwise noted all dimensions are given in inches millimeters Minimum suggested and required material thickness for hollow metal f...

Страница 2: ...ches mm Thickness recommended for reinforcements in hollow metal doors and frames is charted at the left of this page Do not scale drawing Left hand door shown Maximum frame reveal is 6 7 8 175mm for...

Страница 3: ...r unreinforced hollow metal frames or for aluminum frames six 6 Connect conduit to frame side of backplate Fasten unit to door frame seven screws Fasten unit to door frame seven screws Mount conduit b...

Страница 4: ...door Allow door to close Loosen and readjust Open Position Ring as necessary to obtain desired door open position Tighten set screw Make all connections necessary for any accessories to the 4 positio...

Страница 5: ...talled on the bracket Optional Bracket for surface wiring Ground Lead Power Leads Ground Screw Green Cable Clamps Conduit by Others from top T1 Power Input Terminal 80 9357 0110 020 Rev A 5 Ground Wir...

Страница 6: ...lapsed 1 2 3 4 1 2 3 4 Door 1 Door 2 POT FUNCTION DESCRIPTION CL Obstruction Detection on Open CW Increase CCW Decrease MAX Door Open Speed CW Increase CCW Decrease MIN Motor Reversing Speed CW Increa...

Страница 7: ...Supplied by Others 24VDC Out 24 VDC Electric Strike Wall Switch Card Reader Key Switch etc Normally Open Momentary dry contacts Notes 1 Power input to Door Operator Unit is at T1 Power Input Terminal...

Страница 8: ...e requirements for the Power Assist Door POR Function is designed to meet or exceed all of the requirements for the Low Energy Power Operated Door C US UL An ASSAABLOY Group Co 1902 Airport Road Monro...

Страница 9: ...hinges This template not for use with offset pivots Ceiling clearance of 6 152 mm from frame rabbet is required for this application Maximum frame reveal is 1 8 3 mm for this application Conduit hole...

Страница 10: ...11 11 16 297 3 8 19 14 3 16 360 13 13 16 351 Door Opening Angle Dim A Dim B Up to 110 111 to 170 12 305 9 1 2 241 13 1 4 337 15 3 4 400 Frame Rabbet REVEAL Notes Do not scale drawing Left hand door sh...

Страница 11: ...cordance with national and local wiring codes Note Unless otherwise noted all dimensions are given in inches millimeters Minimum suggested and required material thickness for hollow metal frames skin...

Страница 12: ...mm Thickness recommended for reinforcements in hollow metal doors and frames is charted at the left of this page Do not scale drawing Left hand door shown Maximum frame reveal is 7 178mm for this app...

Страница 13: ...ith the flat corner of the pinion shaft square See Fig 1 upper right Frame Door A Prepare holes for 1 4 20 machine screws or No 14 x 2 3 4 70mm wood screws Blind rivet nuts by others are suggested for...

Страница 14: ...en door reaches 20 switch Breaker Switch to position cutting power to the unit Allow door to fully close door may be manually pulled closed Once door has fully closed manually open door slightly and i...

Страница 15: ...talled on the bracket Optional Bracket for surface wiring Ground Lead Power Leads Ground Screw Green Cable Clamps Conduit by Others from top T1 Power Input Terminal 80 9357 0130 020 Rev A 5 Ground Wir...

Страница 16: ...apsed 1 2 3 4 1 2 3 4 Door 1 Door 2 POT FUNCTION DESCRIPTION CL Obstruction Detection on Open CW Increase CCW Decrease MAX Door Open Speed CW Increase CCW Decrease MIN Motor Reversing Speed CW Increas...

Страница 17: ...Supplied by Others 24VDC Out 24 VDC Electric Strike Wall Switch Card Reader Key Switch etc Normally Open Momentary dry contacts View of Jumper in Normally Open Position For Use With Fail Safe Strike...

Страница 18: ...e requirements for the Power Assist Door POR Function is designed to meet or exceed all of the requirements for the Low Energy Power Operated Door C US UL An ASSAABLOY Group Co 1902 Airport Road Monro...

Отзывы: