Documentation Release Note
Number: MER-1002-003
No
r
tel Networks 11/4/02 4 of 26
TM
When a two port CNI card is replaced with a three port CNI-3 card, the
original port assignments for the backplane connections remain the same.
Procedure 2
Installing the CNI-3 cards
1
On the
inactive
Core, software disable the CNI slots where the new
cards will be installed:.
2
Faceplate disable the CNI cards to be replaced on the
inactive
Core.
3
Remove the CNI cards to be replaced, if necessary.
4
Install the new CNI-3 cards. The CNI-3 cards must be faceplate
disabled before installation.
5
Faceplate enable all CNI cards on the
inactive
Core.
—————————— End of Procedure ——————————
Procedure 3
Adding a CNI group
1
Add CNI group(s).
2
Software enable the
original
CNI ports on the
inactive
Core. Do NOT
activate the CNI ports for the new Network Groups:.
3
Switch active Cores:
4
Follow steps 1 and 2 to install the CNI cards on the second Core. Be
sure to make the second Core
inactive
.
LD 135
to load the program.
DIS CNI
c s p
(core slot port)
to disable the card and ports.
LD 17
to load the program
CHG
change existing data block
CEQU
type of data block
CNI s p g
(slot port group) to add a CNI group
LD 135
to load the program.
ENL CNI
c s p
(core slot port)
to enable the card and ports.
SCPU
t
o switch Cores