Documentation Release Note

Number: MER-1002-003

No

r

tel Networks 11/4/02 24 of 26

 

TM 

4

Verify that all cables are labeled and in place. Failure to pre-route 
cables will result in increased downtime and possible system failure. 
See “Pre-route the FIJI cables” on page 9 if the cables are not already 
routed.

5

Break Ring 0 by removing the cable from the current highest Network 
Group P1 to Group P2. The Rings will switch to SURVIVAL STATE 
once the Ring is broken.

6

Attach the new Ring 0 cables in the correct configuration.

7

Make Clock 0 active.

8

Break Ring 1 by removing the cable from Group 0 P1 to the current 
highest Network Group P2. 

9

Attach the new Shelf 1 Fiber Ring cables in the correct configuration. 

10

Verify that the Rings are in Survival State and FIJI cards are enabled.

Note: The readout will specify the state of the Rings and which FIJI 
cards are enabled or disabled.

11

Reset the Rings.

12

Check that the Rings operate correctly.

LD 60

to load the program

SSCK 0

to check if Clock 1 is active or standby

SWCK 

to switch to clock 0

****

to exit the program

LD 39

to load the program

STAT RING 0

to check the status of Ring 0

STAT RING 1

to check the status of Ring 1

LD 39

to load the program

RSET 

to reset the Rings

RSTR

to restore the Rings

LD 39

to load the program

STAT RING 0

to check the status of Ring 0

STAT RING 1

to check the status of Ring 1

Содержание MER-1002-003

Страница 1: ...h FNF and include Option 81C CNI group assignments on a system that originated as a non FNF system prior to X11 Release 25 Correction Note Figure table procedure and page numbers for example Table 5 p...

Страница 2: ...s if necessary 2 Pre routing CNI to 3PE cables 4 Pre route the FIJI cables 8 Installing cards in the Network modules 16 Installing and enable the 3PE cards 16 Installing and enabling the Peripheral Si...

Страница 3: ...81C systems with Core Net shelves Procedure 1 Removing the 3PE card from both Cores 1 In Core 1 hardware disable the 3PE card 2 In Core 0 hardware disable the 3PE card 3 Remove the 3PE faceplate cabl...

Страница 4: ...e faceplate disabled before installation 5 Faceplate enable all CNI cards on the inactive Core End of Procedure Procedure 3 Adding a CNI group 1 Add CNI group s 2 Software enable the original CNI port...

Страница 5: ...te to the 3PE card with two NT9D89 cables When a CNI card is upgraded to a CNI 3 card the original NTND14 backplane cables are left in place only the NT9D89 CNI 3 to 3PE faceplate cables must be added...

Страница 6: ...4 NTND14 1 9A Core backplane J3 NTND14 1 9C Core backplane J4 NTND14 2 9D Core backplane J3 NTND14 2 9F Core backplane J4 NTND14 3 10A Core backplane J3 NTND14 3 10C Core backplane J4 NTND14 4 10D Cor...

Страница 7: ...e J3 NTND14 3 13C Core Net backplane J4 NTND14 4 13D Core Net backplane J3 NTND14 4 13F Core Net backplane J4 NTND14 5 13 J1 CNI 3 faceplate J3 NT9D89 5 13 J2 CNI 3 faceplate J4 NT9D89 6 14A Core Net...

Страница 8: ...13D Core Net backplane J3 NTND14 3 13F Core Net backplane J4 NTND14 4 14A Core Net backplane J3 NTND14 4 14C Core Net backplane J4 NTND14 5 14D Core Net backplane J3 NTND14 5 14F Core Net backplane J...

Страница 9: ...helf 1 of each new Network Group Figure 1 Route FIJI to FIJI cables Option 81C example J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 Tx J1 Rx J2 Group 0 shelf 0 Group 0 shelf 1 Tx J1 Rx J2 Group 2 shelf 0...

Страница 10: ...Ring cable of the appropriate length from the FIJI card in shelf 0 of the current highest Network Group to the FIJI card in shelf 0 of the new Network Group 4 If more than one Network Group is to be...

Страница 11: ...ptic cable Tx J1 Rx J2 Group 0 shelf 0 Group 0 shelf 1 Tx J1 Rx J2 Group 2 shelf 0 Tx J1 Rx J2 Group 2 shelf 1 Tx J1 Rx J2 Group 4 shelf 1 Tx J1 Rx J2 Group 4 shelf 0 Tx J1 Rx J2 Group 3 shelf 0 Tx J1...

Страница 12: ...ns Groups X 0 are cabled in ascending order Group shelf NTRC48 fiber cable connector FIJI card connector 0 0 P1 Tx J1 1 0 P2 Rx J2 1 0 P1 Tx J1 2 0 P2 Rx J2 2 0 P1 Tx J1 3 0 P2 Rx J2 3 0 P1 Tx J1 4 0...

Страница 13: ...N Damage to Equipment Do not excessively bend or cinch the Fiber Ring cables These cables are easily damaged Use the Optical Cable Management Card OCMC to manage and protect the Fiber Ring cables NTRC...

Страница 14: ...NTRC48 FIJI Fiber Ring cable of the appropriate length from shelf 1 of the FIJI card in Group 0 to the FIJI card in the new highest Network Group shelf 1 4 Route a NTRC48 cable from the FIJI card in t...

Страница 15: ...s Groups 0 X are cabled in descending order Group shelf NTRC48 fiber cable connector FIJI card connector 0 1 P1 Tx J1 7 1 P2 Rx J2 7 1 P1 Tx J1 6 1 P2 Rx J2 6 1 P1 Tx J1 5 1 P2 Rx J2 5 1 P1 Tx J1 4 1...

Страница 16: ...Ring example NTRC48xx fiber optic cable Group 0 shelf 0 Group 0 shelf 1 Tx J1 Rx J2 Group 2 shelf 0 Group 2 shelf 1 Tx J1 Rx J2 Group 4 shelf 1 Tx J1 Rx J2 Group 4 shelf 0 Group 3 shelf 0 Group 3 she...

Страница 17: ...ing the Conf TDS cards if necessary on page 19 End of Procedure Installing and enable the 3PE cards Three steps are required to install the 3PE cards Procedure 8 Installing and enabling 3PE cards 1 Ve...

Страница 18: ...7 8 0 3PE cards connected to the a CNI in Core or Core Net 0 0 on on on on 1 on on off on 2 on off on on 3 on off off on 4 off on on on 5 off on off on 6 off off on on 7 off off off on 1 3PE cards co...

Страница 19: ...abling and inserting the FIJI cards Procedure 10 Disabling and inserting FIJI cards 1 Faceplate disable the FIJI cards 2 Insert the FIJI cards into slots 2 and 3 of each new Network module Do not plug...

Страница 20: ...d connected to the 3PE cards See Pre routing CNI to 3PE cables on page 5 2 Attach the cables to the inactive CNI cards See Table 1 Option 81 CNI group assignments on page 6 Table 2 Option 81C CNI grou...

Страница 21: ...on each new FIJI card is disabled 2 Plug the FIJI cards into the Network module backplane Push the latches forward to lock the card in place 3 Enable the faceplate switch Note The card will not enabl...

Страница 22: ...4 Connect new groups to the Fiber Network 1 In each new Network Group connect a NTRC47AA cable from J4 to J4 of the FIJI cards See Figure 5 LD 17 to load the program REQ CHG TYPE CEQU XCT xxx enter th...

Страница 23: ...am LD 60 to load the program SSCK 0 to check if Clock 0 is active or standby SWCK to switch clocks if necessary to exit the program J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 J3 J4 NTRC47AA FIJI to FIJI cabl...

Страница 24: ...rom Group 0 P1 to the current highest Network Group P2 9 Attach the new Shelf 1 Fiber Ring cables in the correct configuration 10 Verify that the Rings are in Survival State and FIJI cards are enabled...

Страница 25: ...ted as a non FNF system prior to X11 Release 25 on page 8 for slot and Group assignments 14 Plug in the Conf TDS cards Push the latches forward to lock the card in place 15 Faceplate enable the Conf T...

Страница 26: ...ks 11 4 02 26 of 26 TM Projected Inclusion in NTP This correction will be included in the next standard release of Meridian 1 documentation Nortel Networks the Nortel Networks logo the Globe mark SL 1...

Отзывы: