Documentation Release Note
Number: MER-1002-003
No
r
tel Networks 11/4/02 21 of 26
TM
4
Switch active Cores:
5
Repeat steps 1 through 5 to attach the CNI to 3PE cables on the
second Core side. Make sure that the second Core is now
inactive
.
—————————— End of Procedure ——————————
Enabling the FIJI cards
The FIJI cards are placed but not inserted and connected in slots 2 and 3 of
each new Network shelf. Follow Procedure 13 to enable the card.
Procedure 13
Enabling the FIJI card
1
Verify that the faceplate switch on each new FIJI card is
disabled.
2
Plug the FIJI cards into the Network module backplane. Push the
latches forward to lock the card in place.
3
Enable the faceplate switch.
Note: The card will not enable until a loop in that Network shelf is
defined as described below.
4
Wait for the FIJI LED panel to display the Network Group and shelf of
the card. This information is based on the 3PE switch settings. Verify
that this information matches the printed label on the outside of the
module case.
Note 1: The time required for the FIJI cards to display group and shelf
information will vary.
Note 2: For 3PE switch settings, see “Installing and enable the 3PE
cards” on page 17.
SCPU
to switch Cores