PAGE 20 Reznor, FSE, Installation Manual, EN 2020-02, D301160 Iss H
Burner assembly
The installer is in charge of mounting,
electrically connecting and setting the
burner.
• These operations should be carried out
only by a qualified engineer, carefully
complying with the burner and technical
manuals (provided together with the
device).
• If the burner does not have a certificate
please contact the manufacturer
immediately, before progressing
forward.
• The data for the RIELLO brand burners
are subject to change without notice.
We always recommend consulting the
latest version of the burner instructions.
• The new burner models are in a
continuous stage of improving.
For specific needs, consult the
manufacturer.
Air intake and supply
(ducted units only)
Connect the ducts of the air inlet circuit to
the side opening, the appliance is set up for
both right and left connections. To change
the air inlet side, simply swap the grille and
blanking panels around.
To attach an air inlet duct, remove the grille
and attach the duct to the heater flanges.
The warm air distribution duct is attached
to the flanges at the outlet of the heater.
Connection with ducting and/or accessories
should be carried out by fitting sealing
gaskets.
This precaution is necessary to ensure the
joint is correctly tightened. In order to
prevent vibrations from transmitting to the
air pipes, we recommend installing suitable
anti-vibration joints.
Check with the plant designer about
installing a fire resistant shutter.
Note: The dimensions of the air inlet
and outlet ducts should be defined by a
qualified engineer, on the basis of the
performance specified in Table 2
Figure 10 Air intake and supply (ducted
units only
1. Air outlet direction
2. Air intake direction
Figure 11. Burner opening dimensions