Nortek R6GF Series Скачать руководство пользователя страница 2

2

TABLE OF CONTENTS

IMPORTANT SAFETY INFORMATION ............................. 3

REQUIREMENTS & CODES ............................................. 4

GENERAL INFORMATION ................................................ 5

Before you install this unit ................................................ 5

Locating the Equipment ................................................... 5

Heating Load ................................................................... 5

COMBUSTION AIR & VENTING REQUIREMENTS ......... 6

General Information ......................................................... 7

Vent Termination ............................................................. 7

CIRCULATING AIR SUPPLY ............................................ 8

Air Ducts .......................................................................... 8

Air Filter Requirements .................................................... 8

Unconditioned Spaces ..................................................... 8

Acoustical Duct Work ...................................................... 8

UNIT INSTALLATION ........................................................ 9

Packaging Removal ......................................................... 9

Rigging & Hoisting ........................................................... 9

Clearances to Combustible Materials .............................. 9

Ground Level ................................................................... 9

Rooftop ............................................................................ 9

Horizontal to Downflow Conversion ................................. 9

Condensate Drain ............................................................ 9

ELECTRICAL WIRING ...................................................... 10

Pre-Electrical Checklist .................................................... 10

Line Voltage ..................................................................... 11

Thermostat / Low Voltage Connections ........................... 11

Heat / Cool Thermostat ................................................ 11

Checking Heat Anticipator Settings ............................. 12

Heating Configurations .................................................... 12

Configuring the Variable Speed Blower ........................... 12

Selecting Cooling Airflow ............................................. 12

Selecting Gas Heating Airflow ..................................... 12

Optional Humidistat ......................................................... 12

Optional Comfort Alert

TM

 Diagnostics Module .................. 13

24 VAC Power Wiring .................................................. 13

Thermostat Demand Wiring ......................................... 13

L Terminal Wiring ......................................................... 13

DC SOL Connection .................................................... 13

Interpreting the Diagnostic LED’s ................................ 13

LED Description ........................................................... 13

Installation Verification ................................................. 14

Troubleshooting the Installation ................................... 14

Resetting Alert Codes .................................................. 14

Grounding ........................................................................ 14

GAS SUPPLY & PIPING .................................................... 14

Leak Check ...................................................................... 15

High Altitude Conversion ................................................. 15

LP/Propane Gas Conversion ........................................... 16

START UP & ADJUSTMENTS .......................................... 17

Pre-Start Check List ........................................................ 17

Start-Up Procedure .......................................................... 17

Air Circulation ............................................................... 17

System Cooling ............................................................ 17

System Heating ............................................................ 17

Verifying & Adjusting Temperature Rise .......................... 17

Verifying & Adjusting Firing Rate ..................................... 18

Verifying Over-Temperature Limit Control Operation ...... 18

Verifying Burner Operation .............................................. 18

Manifold Pressure Adjustment ......................................... 18

OPERATING SEQUENCE ................................................. 19

Heating Mode .................................................................. 19

Cooling Mode .................................................................. 19

Fan Mode ........................................................................ 20

EQUIPMENT MAINTENANCE ........................................... 20

Cleaning of Heat Exchanger ............................................ 20

Cleaning of Burners ......................................................... 21

REPLACEMENT PARTS ................................................... 21

COMPONENT FUNCTIONS .............................................. 21

TROUBLESHOOTING ....................................................... 22

FIGURES & TABLES ......................................................... 23

Figure 9. Unit Dimensions ............................................ 23

Table 8. Center of Gravity & Unit Shipping Weights .... 23

Airflow Data ..................................................................... 24

Table 9. Nominal Airflow Rates & Temperature

Rises (° F) ...................................................... 24

Table 10. Airflow Settings for Cooling .......................... 24

Table 11. Airflow Settings (CFM) & Rise (° F) for

Heating ........................................................ 24

Gas Information ............................................................... 25

Table 12. Gas Pipe Capacities .................................... 25

Table 13. Gas Flow Rates ........................................... 25

Figure 10. Gas Valve Label ......................................... 26

Electrical Information ....................................................... 27

Figure 11. Two Stage Heating / Two Stage

Cooling Configuration ................................. 27

Figure 12. Two-Stage, Hot Surface Ignition & Blower

Control Board ............................................. 27

Figure 13. Two Stage Cool, Two Stage Heat .............. 28

Figure 14. Two Stage Cool, Two Stage Heat with

Optional Comfort Alert ................................ 29

Comfort Alert Troubleshooting Tables ............................. 30

Table 14. LED Diagnostics .......................................... 30

Table 15. Module Wiring Troubleshooting ................... 31

REFRIGERANT CHARGING ............................................. 32

Charging an R-410A unit in AC mode at outdoor

temperatures above 65F. ............................................. 32

Charging Charts & Application Notes .............................. 32

Figure 15. Charging Chart for 2 Ton Units ................... 33

Figure 16. Charging Chart for 3 Ton Units ................... 33

Figure 17. Charging Chart for 4 Ton Units ................... 34

Figure 18. Charging Chart for 5 Ton Units ................... 34

INSTALLATION CHECKLIST ............................................ 36

Содержание R6GF Series

Страница 1: ...plier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Ne pas entreposer ni utiliser de l essence ni d autres vapeurs ou...

Страница 2: ...ion 17 System Cooling 17 System Heating 17 Verifying Adjusting Temperature Rise 17 Verifying Adjusting Firing Rate 18 Verifying Over Temperature Limit Control Operation 18 Verifying Burner Operation 1...

Страница 3: ...g is required If repairs make it necessary for evacuationandcharging itshouldonlybeattempted by qualified trained personnel thoroughly familiar with this equipment Some local codes require licensed in...

Страница 4: ...ctions and all applicable local codes Install this unit only in a location and position as specified on page 7 This unit is designed only for outdoor installations and should be located with considera...

Страница 5: ...D gaugement conforme aux codes d installation locaux aux exigences du fournisseur de gaz et aux instructions d installation du fabricant Aclearanceofatleast36inchesfromthebloweraccesspanel andfromthe...

Страница 6: ...nt pas suivies pour chacun des appareils raccord s au syst me de ventilationaumomentdesamiseenmarche celapeut entra ner une intoxication au monoxyde de carbone ou la mort Les tapes suivantes doivent t...

Страница 7: ...fault condition If this control must be replaced use only factory authorized replacement parts See the list of Replacement Parts on page 21 Vent Termination This unit has been equipped with an integr...

Страница 8: ...gned so that the return air to the unit is not less than 50 F 10 C during heating operation If a combination of indoor and outdoor air is used the ducts and damper system must be designed so that the...

Страница 9: ...g enough to support the unit s weight The slab height must be a minimum of 2 5cm above grade and with adequate drainage See Figure 3 Remove and discard the horizontal supply and return duct covers loc...

Страница 10: ...lectrique au g n rateur d air chaud avant de prod der aux travaux d entretein Au moment de l entretien des commandes tiquetez tous les fils avant de les d brancher S assurer de les raccorder correctem...

Страница 11: ...rdancewith the instructions supplied with the thermostat and the indoor equipment These units use a special 2 speed compressor to achieve a high level of efficiency in a compact frame A 2 stage coolin...

Страница 12: ...r system options With the blower installed and configured properly the furnace will gradually change speed in response to changes in system variables such as thermostat settings duct static filters et...

Страница 13: ...noid damage from overheating conditions L Terminal Wiring White RodgersCompatibleThermostats TheLconnection is used to communicate Comfort Alert codes to compatible White Rodgersthermostats TheLtermin...

Страница 14: ...al Electrical Code ANSI NFPA 70 or the CSA C22 1 Electrical Code Use the grounding lug provided in the control box for grounding the unit GAS SUPPLY PIPING WARNING FIRE OR EXPLOSION HAZARD Failure to...

Страница 15: ...ectors A soap and water solution can be applied on each joint or union using a small paintbrush If any bubbling is observed the connection is not sealed adequately and must be retightened Repeat the t...

Страница 16: ...al Gas R6GF X24K080XB R6GF X36K100XB MANIFOLD PRESSURE FOR NATURAL GAS INSTALLATIONS IN W C ALTITUDE ABOVE SEA LEVEL HEATING VALUE BTU CU FT ORIFICE SIZE 800 TO 899 FT 900 TO 999 FT 1 000 TO 1 100 FT...

Страница 17: ...perly after 1 2 minutes lower the thermostat temperature set point an additional 3 4 degrees until the cooling system moves into 2nd stage or high cool operating mode The compressor and indoor blower...

Страница 18: ...operating sequence page 19 NOTE The over temperature limit control should turn off the gas valve within approximately four minutes exact time depends on the efficiency of the close off when blocking t...

Страница 19: ...on step 6 begins If no flame is sensed on the fifth try for ignition the furnace control is locked and the red LED will flash 4 times repetitively The thermostat must be opened for at least ten second...

Страница 20: ...eginning of each heating and cooling season or more frequently if required Inspectthecondensatedrainandoutdoorcoilatthebeginning of each cooling season Remove any debris Clean the outdoorcoilandlouver...

Страница 21: ...ches separate the ground joint union in the gas supply piping at the unit 7 Remove the piping between the gas valve and the ground joint union if applicable 8 Remove all screws securing the burner ass...

Страница 22: ...Speed Blower call OFF SYSTEM STATUS CFM LED STATUS YELLOW NOT USED OFF automatically opens and regulates the gas pressure in the manifold See Figure 8 page 18 Over Temperature Limit Control The over t...

Страница 23: ...rizontal Supply Duct Opening Horizontal Return Duct Opening 4 0 1 75 9 75 24 75 16 0 Condensing Coil 13 5 16 0 16 0 C 13 5 Figure 9 Unit Dimensions Table 8 Center of Gravity Unit Shipping Weights MODE...

Страница 24: ...ormal 1170 Normal 1700 10 990 10 1290 10 1870 TAP C 10 900 TAP C 10 1140 TAP C 10 1620 Normal 1000 Normal 1270 Normal 1800 10 1100 10 1400 10 1980 TAP D 10 1080 TAP D 10 1260 TAP D 10 Normal 1200 Norm...

Страница 25: ...9 86 42 209 419 88 41 205 409 90 40 200 400 92 39 196 391 94 38 191 383 96 38 188 375 98 37 184 367 100 36 180 360 102 35 176 353 104 35 173 346 106 34 170 340 108 33 167 333 110 33 164 327 112 32 161...

Страница 26: ...compagnie du gaz en utili sant le t l phone d un voisin A d faut de la compagnie du gaz avertir le service des pompiers C Enfoncer ou faire tourner le robinet gaz la main seulement Ne jamais utiliser...

Страница 27: ...UNIT CONTROL BOARD W1 W2 C R G Y Y2 0 DEHUM P2 1 5 HUM LINE XMFR CONT EAC COOL PARK1 PARK2 HI HEAT LO HEAT NEUTRALS AUTO HEAT STAGE 10 5 NONE HOT SURFACE IGNITION VARIABLE SPEED BLOWER CONTROL BOARD C...

Страница 28: ...208 230 Volt Single Phase Packaged Two Stage Heat Two Stage Electric Air Conditioner 60Hz WIRING DIAGRAM NOTES 1 Disconnect power before servicing 2 For supply connections use copper conductors only...

Страница 29: ...Single Phase Packaged Two Stage Heat Two Stage Electric Air Conditioner 60Hz WIRING DIAGRAM NOTES 1 Disconnect power before servicing 2 For supply connections use copper conductors only 3 Not suitabl...

Страница 30: ...fective Condenser coil is dirty Liquid line restriction filter drier blocked if present in system Thermostat is malfunctioning Solenoid plug not connected Y2 not wired at Comfort Alert Check thermosta...

Страница 31: ...s flashing at same time means control circuit voltage is too low for operation Table 14 LED Diagnostics Continued Table 15 Module Wiring Troubleshooting MISWIRED MODULE INDICATION RECOMMENDED TROUBLES...

Страница 32: ...repeat steps 1 through 3 until the system is correctly charged Charging Charts Application Notes This equipments cooling system contains refrigerant under high pressure always use safe practices when...

Страница 33: ...igerant when below curve Remove refrigerant when above curve Figure 15 Charging Chart for 2 Ton Units Figure 16 Charging Chart for 3 Ton Units Liquid Pressure psig Liquid Temperature F R6GF X36 Chargi...

Страница 34: ...igerant when below curve Remove refrigerant when above curve Figure 18 Charging Chart for 5 Ton Units Figure 17 Charging Chart for 4 Ton Units Liquid Pressure psig Liquid Temperature F R6GF X48 Chargi...

Страница 35: ...35...

Страница 36: ...nit YES NO ELECTRICAL SYSTEM Electrical connections tight YES NO Line voltage polarity correct YES NO Rated Voltage VOLTS L1 L2 Volts __________________________________________________________________...

Отзывы: