FIGURES AND TABLES

pinched and foam guards are in place.

16. Replace the electric heat vestibule cover removed in Step 

2 and secure with screw.

17. Replace the compressor access panel.

AIRFLOW

The maximum external static pressure (ESP) for the unit is 

listed on the unit rating label.
The blower speed is preset at the factory for optimum 

operation in Heating and Cooling modes. It may be necessary 

for some applications to change the factory set speed due 

to the addition of electric heat kits. To change the blower 

speed see the “Blower Speed” section in the Installation 

Instructions shipped with the unit. If a lower blower speed 

is desired, then the heater element high temperature limits 

must be checked for proper operation. Nuisance tripping and 

cycling of the limits may result with too little of airflow. Limit 

operation should be checked with return air temperatures 

between 72°F and 78°F. If a higher blower speed is desired 

from the factory then no other testing is required.

IMPORTANT NOTE:

When installing H9HK heater kits In P7TQ Series 

Table 2. Heat Rise and Range

NOMINAL

TONNAGE

UNIT

NOMINAL

KW

HEATER

KIT MODEL

HEATER KIT

PART NUMBER

BREAKERS

WIRING DIAGRAM

NUMBER

LIMIT

6-, 7.5-, 10-, and 12.5-ton 

 

208–230V, 3PH

P7TQ(072/090/120/150-C)

9

H9HK009Q-01

1011669

NONE

Figure 14

155°F

18

H9HK018Q-11

1011672

1

Figure 16

155°F

30

H9HK030Q-21

1011675

2

Figure 18

210°F

35

H9HK035Q-21

1011678

2

Figure 18

210°F

6-, 7.5-, 10-, and 12.5-ton 

 

460V, 3PH

P7TQ(072/090/120/150-D)

9

H9HK009S-01

1011670

NONE

Figure 15

155°F

18

H9HK018S-01

1011673

NONE

Figure 17

155°F

30

H9HK030S-01

1011676

NONE

Figure 19

210°F

35

H9HK035S-01

1011679

NONE

Figure 19

210°F

Table 3. Heater Kit Model Cross Reference

packaged units (on duct systems where the unit ESP 

is greater than that marked on the unit rating label) the 

heater kit may require the addition of a high static drive 

kit to increase blower performance. For blower data See 

the unit blower performance tables in the Installation 

Instructions shipped with the unit. For accessory 

description and part number info refer to the Technical 

Sales litertaure.
Nominal heater kit temperature rise data shown in 

Table 2

 

was calculated using the formula below.

Temp Rise: ΔT= (Btu/h)/(CFM*1.08)

NOTE: Generally the heat rise should be near values shown. 

Anything greater than 3–5° above that shown should be 

avoided.

6

CP-H9HK (05-20) 1012566-B

MODEL

NUMBER

NOMINAL

RATED CFM

TEMPERATURE RISE °F (°C)

*

9 KW

18 KW

30 KW

35 KW

P7TQ072-*

2,550

11°F (6°C)

22°F (12°C)

37°F (21°C)

43°F (24°C)

P7TQ090-*

3,150

9°F (5°C)

18°F (10°C)

30°F (17°C)

35°F (19°C)

P7TQ120-*

3,450

8°F (4°C)

16°F (9°C)

27°F (15°C)

32°F (18°C)

P7TQ150-*

4,300

7°F (4°C)

13°F (7°C)

22°F (12°C)

26°F (14°C)

*

Temperature rise calculation = rise (°F) = (kW*3413) / 1.08 / nominal CFM.

NOTE: For 208–230V electric heat kits operating @ 208 Volts, the kW rating is derated 25%, therefore temperature rise will be lower than the 

values in the table.

Содержание 1011669

Страница 1: ...with these instructions and with all applicable national and local codes and standards Please read all instructions carefully before starting the installation Return these instructions to the customer...

Страница 2: ...ons are primarily intended to assist qualified individuals experienced in the properinstallationofthesecomponents Somelocalcodes may require licensed installation service personnel for this type of eq...

Страница 3: ...and DO NOT serve as a unit disconnect The circuit breakers DO NOT provide over current protection of the supply wiring Whether or not circuit breakers are used in the units protection and disconnect...

Страница 4: ...supply grille 1 Remove Compressor Access panel See Figure 2 foam wire guards for later use See 4 Install the DIN rail mounting bracket inside of the unit and tightly secure it with two screws See NOT...

Страница 5: ...m flange of the element mounting plate to the bottom pan and then one in the rear of the element assembly support bracket as shown in and 11 Route all wiring out the two wire passage holes and foam wi...

Страница 6: ...0Q 21 1011675 2 Figure 18 210 F 35 H9HK035Q 21 1011678 2 Figure 18 210 F 6 7 5 10 and 12 5 ton 460V 3PH P7TQ 072 090 120 150 D 9 H9HK009S 01 1011670 NONE Figure 15 155 F 18 H9HK018S 01 1011673 NONE Fi...

Страница 7: ...49 4 58 5 30 35 50 60 UNIT EQUIPPED WITH 3 HP 2 SPEED MOTOR HEATER KIT 3 HP 2 SPEED MOTOR HEATER KIT POWER EXHAUST COOLING TONNAGE UNIT VOLTAGE MCA MOP MCA MOP 9 KW 18 KW 30 KW 35 KW 9 KW 18 KW 30 KW...

Страница 8: ...7 40 31 7 40 31 7 40 31 7 40 14 9 15 27 1 30 43 3 45 52 3 60 HIGH STATIC DRIVE OPTIONAL 3 HP ECM MOTOR 6 208 240 33 7 50 33 7 50 33 7 50 33 7 50 23 5 27 1 30 30 45 4 52 3 50 60 75 0 86 6 80 90 90 7 1...

Страница 9: ...POWER SUPPLY L1 L2 L3 To Cooling Circuit Power Supply Disconnect Main Control Panel 3 Pole Terminal Block To Cooling Components and Control L1 L2 L3 L1 L2 L3 Electric Heat 3 Pole Terminal Block Elect...

Страница 10: ...BE REPLACED WITH WIRING MATERIAL OF THE 1 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS 1...

Страница 11: ...T BE REPLACED WITH WIRING MATERIAL OF THE 1 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS...

Страница 12: ...OF THE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS 1012105A Replaces 10121050 05 17 18 kW 1 Stage 20...

Страница 13: ...RING MATERIAL OF THE 1 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS 1012106A Replaces 10...

Страница 14: ...HE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS 1012108A Replaces 10121080 05 17 30 35 kW 1 Stage 208...

Страница 15: ...THE ORIGINAL WIRE AS SUPPLIED WITH THE UNIT MUST BE NOTES 2 USE COOPER CONDUCTORS WITH A MINIMUM TEMPERATURE RATING OF 60 C FOR SUPPLY CONNECTIONS 1012109A Replaces 10121090 05 17 30 35 kW 1 Stage 48...

Страница 16: ...HESE INSTALLATION INSTRUCTIONS WITH THE HOMEOWNER Specifications and illustrations subject to change without notice or incurring obligations 2020 Nortek Global HVAC LLC O Fallon MO All rights reserved...

Отзывы: