![Nortec UL10 Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/nortec/ul10/ul10_operation-manual_1705753059.webp)
CHARGER / DISCAHRGER UL10
OPERATION MAUNAL
58
©
NorTec Electronics 2014
7.21 Program 420. Maintenance – enclosed aircraft nickel-cadmium battery
Stage
name
Maximum
duration
Program
number
420
Operation
number
4
Operation
type
Maintenance
Battery type
Nickel-cadmium
Manufacturing
process
Fused
electrodes
Access
to
valves
open
Battery
type
20
Minimum
battery
capacity
4 Ah
Maximum
battery
capacity
50 Ah
Minimum
battery
voltage
1,2 V
Maximum
battery
voltage
31,2 V
Maximum number of batteries
26
Stage 1 (
S1
)
Discharge
1
Discharge
current
х
= 1
max. 6 min.
а
= x
С
(A)
Stage 1 (
S1
)
Discharge 1
Discharge depth
1
max. 6 min.
V/battery
Stage 2 (
S2
)
I-Charge
1
Current
=
x
С
(A)
х
= 1
max. 72 min.
Stage 2 (
S2
)
I-Charge 1
Umax = V/battery
1.55
max. 72 min.
Stage 3 (
S3
)
Topping charge 1
Current = x
С
(A)
х
= 0.1
120 min.
Stage 4 (
S4
)
Discharge
2
Discharge
current
х
= 1
1 h
а
= x
С
(A)
Stage 4 (
S4
)
Discharge
2
Discharge
depth 0.5
1
h
V/battery
Stage 5 (
S5
)
I-Charge
2
Current
=
x
С
(A)
х
= 1
1 h
Stage 5 (
S5
)
I-Charge 2
Umax = V/battery
1.55
1 h
Stage 6 (
S6
)
Topping charge 2
Current = x
С
(A)
х
= 0.2
90 min.
Stage 6 (
S6
)
Topping charge 2
Measurement of
Sound signal
75 min.
voltages of individual
batteries
Stage 6 (
S6
)
Topping charge 2
Electrolyte level
Sound signal
75 min.
equalization
Содержание UL10
Страница 2: ...CHARGER DISCAHRGER UL10 OPERATION MAUNAL NorTec Electronics 2014 1 ...
Страница 3: ...CHARGER DISCAHRGER UL10 OPERATION MAUNAL 2 NorTec Electronics 2014 CHARGER DISCHARGER UL10 ...
Страница 73: ...CHARGER DISCAHRGER UL10 OPERATION MAUNAL 72 NorTec Electronics 2014 switch off the device ...
Страница 74: ...CHARGER DISCAHRGER UL10 OPERATION MAUNAL NorTec Electronics 2014 73 Protection according to DIN 34 ...