background image

40

Gas Information

Table 8

GAS FLOW RATES

(CUBIC FEET PER HOUR)

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

10

360

1,800

3,600

12

300

1,500

3,000

14

257

1,286

2,571

16

225

1,125

2,250

18

200

1,000

2,000

20

180

900

1,800

22

164

818

1,636

24

150

750

1,500

26

138

692

1,385

28

129

643

1,286

30

120

600

1,200

32

113

563

1,125

34

106

529

1,059

36

100

500

1,000

38

95

474

947

40

90

450

900

42

86

429

857

44

82

409

818

46

78

391

783

48

75

375

750

50

72

360

720

52

69

346

692

54

67

333

667

56

64

321

643

58

62

310

621

60

60

300

600

62

58

290

581

64

56

281

563

Table 8. 

Gas Flow Rates

GAS FLOW RATES

(CUBIC FEET PER HOUR)

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

66

55

273

545

68

53

265

529

70

51

257

514

72

50

250

500

74

49

243

486

76

47

237

474

78

46

231

462

80

45

225

450

82

44

220

439

84

43

214

429

86

42

209

419

88

41

205

409

90

40

200

400

92

39

196

391

94

38

191

383

96

38

188

375

98

37

184

367

100

36

180

360

102

35

176

353

104

35

173

346

106

34

170

340

108

33

167

333

110

33

164

327

112

32

161

321

114

32

158

316

116

31

155

310

118

31

153

305

120

30

150

300

Table 9

Capacity of Black Iron Gas Pipe (cu. ft. per hour)

for Natural Gas w/ Specific Gravity = 0.60

Nominal Pipe

Diameter (IN.)

Length of Pipe Run (Feet)

10

20

30

40

50

60

70

80

1/2

130

90

75

65

55

50

45

40

3/4

280

190

150

130

115

105

95

90

1

520

350

285

245

215

195

180

170

1 1/4

1,050

730

590

500

440

400

370

350

1 1/2

1,600

1,100

890

760

670

610

NOTE: The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas flow required by 
the furnace. To determine the cubic feet per hour of gas flow required by the furnace, divide the input rate of the furnace by 
the heating value (from gas supplier) of the gas. 

Cubic Feet Per Hour Required =

Input To Furnace (Btu/hr)

Heating Value of Gas (Btu/Cu. Ft.)

Table 9. 

Gas Pipe Capactities

Содержание M4RC-072D-35C

Страница 1: ...department RISQUE D INCENDIE OU D EXPLOSION Le non respect des avertissements de s curit pourrait entra ner des blessures graves la mort ou des dommages mat riels L installation et l entretien doivent...

Страница 2: ...loor Openings 16 Installing Finger Tabbed Duct Connectors 16 Narrow Duct Attachment Option 1 17 Narrow Duct Attachment Option 2 17 Installing Screw Down Duct Connectors 18 Installing the Downflow Furn...

Страница 3: ...rovide adequate combustion and ventilation air to the furnace space as specified on pages 6 9 Provide adequate clearances around the vent air intake terminal as specified in Figure 7 page 11 Figure 8...

Страница 4: ...mestic hot water equipment where the bottom of the vent terminal and the air intake is installed above four feet above grade the following requirements must be satisfied a A CO detector and alarm shal...

Страница 5: ...Electrical Code NEC ANSI NFPA 70 CANADA Canadian Electrical Code CSA C22 1 Gas Piping Gas Pipe Pressure Testing Current edition of the NFGC and the NFPA 90B For copies contact the National Fire Prote...

Страница 6: ...QUE D EMPOISONNEMENT AU MONOXYDE DE CARBONED Le non respect des consignes suivantes portant sur chacun des appareils raccord s au syst me d vacuation mis en service pourrait entra ner l empoisennement...

Страница 7: ...htly sealed to the furnace The required sizing of these openings is determined by whetherinsideoroutsideairisusedtosupportcombustion the method by which the air is brought to the space and by the tota...

Страница 8: ...ustion Air Drawn from Inside Total Input Rating Btuh Minimum Free Area Each Opening Round Duct Diameter 40 000 100 sq In 12 inches 60 000 100 sq In 12 inches 80 000 100 sq In 12 inches 100 000 100 sq...

Страница 9: ...ntly adopted by the NFGC uses one opening within 12 inches of the top of the space This method may be used if it is acceptable to the local codes The following conditions must be met 1 The opening mus...

Страница 10: ...onofthefurnacecombustionsystem See list of substances on page 4 Route piping as direct as possible between the furnace and the outdoors Horizontal piping from inducer to the flue pipe must be sloped 1...

Страница 11: ...rotection see page 12 Figure 7 12 min to maximum expected snow level both pipes 90 Elbow Exhaust vent option B Exhaust vent option A Mounting kit faceplate secured to wall with screws both pipes Combu...

Страница 12: ...exposed to temperatures below freezing i e when it passes through unheated spaces chimneys etc the pipe must be insulated with 1 2 inch thick sponge rubber insulation Armaflex type insulation or equiv...

Страница 13: ...ponsible for water leakage which occurs due to loose hose connections or improperly sealed drain line pipes CIRCULATING AIR REQUIREMENTS WARNING Do not allow combustion products to enter the circulati...

Страница 14: ...in2 The total free area of openings in the floor or ceiling registers serving the return air duct system must be at least 352 in2 At least one register should be located where it is not likely to be c...

Страница 15: ...and other documents supplied with the furnace and or optional air conditioningequipment Unlessitisnoteddifferentlyinthis manual onlyusefactoryauthorizedkitsandaccessorieson thisappliance Refertolocala...

Страница 16: ...4 210 901991A 904012 10 1 4 260 901992A 904013 12 1 4 311 901993A 904014 NOTE Dimensions shown as Inches Millimeter Table 3 Duct Connector Sizes X FLOOR OPENING FLOOR CAVITY SUPPLY AIR DUCT Locating...

Страница 17: ...form an opening for the duct connector applies to Options A or B 3 Installtheductconnectorwiththebottomtabsextending into the supply air duct 4 Bend the tabs on the bottom of the duct connector upward...

Страница 18: ...y Air Duct Hole for Gas Line Wood Floor Bend tabs up 90 Figure 18 Screw Down Duct Connector Figure 20 Figure 20 A C Coil Box Installation D O N O T I N S T A L L S C R E W S I N T H I S S U R F A C E...

Страница 19: ...f drilling screws secure the bracket to the A C coil box and the furnace Repeat for other side of furnace 5 Position the plenum on top of the coil box and secure together with sheet metal screws The s...

Страница 20: ...have two switches one connected to the static tap on the inducer assembly and the other to the collector box Downflow M4RLSeries furnacesrequireonlyoneswitchconnected to the inducer s static tap as s...

Страница 21: ...itch Accessories The components in Figure 27 Figure 28 page 22 Figure 29 Figure 30 are included in the extra parts bag that is supplied with the purchase of M4RC M4RL furnaces Depending on your partic...

Страница 22: ...ield Supplied 2 PVC ELBOW Field Supplied PVC Trap 2 PVC Tee 2 x 1 2 PVC Reducer 1 2 x 1 2 Hose Barb 1 2 x 3 4 Hose Barb 2 PVC Pipe from Inline Drain Assembly Not Included 1 2 Tubing Formed into a Loop...

Страница 23: ...to the finish flange or vent pipe with a hose clamp if using neoprene couplings Upflowfurnacesrequirethe3 neoprenecouplingclamps to be installed above the coil box Upflow Furnaces Combustion air and...

Страница 24: ...secondary heat exchanger A drain must always be at the lowest point of the venting system NOTE Ifusingacondensatepump thefurnace drain line must be installed above the pumps water line Exceptions clar...

Страница 25: ...ply with the latest edition of the National Fuel Gas Code ANSIZ223 1 or CAN CGAB149 1or 2 Installation Codes Some local regulations require the installation of a manual main shut off valve and ground...

Страница 26: ...t t une solution savonneuse commerciale fabriqu esp cifiquementpurlad tectiondes fuites de gaz Un incendie ou une explosion peut entra ner des dommages mat riels des blessures ou la mort AVERTISSEMENT...

Страница 27: ...Shut Off Valve location requirements NOTE B Inducer assembly omitted for clarity of pipe installation Figure 35 Typical Gas Connections 4 7 5 3 6 UPFLOW MODELS DOWNFLOW MODELS 9 2 See Note B 1 3 See...

Страница 28: ...screw the orifices 7 into the gas manifold assembly 5 by hand until snug then tighten with a wrench 12 Install the appropriate LP Propane orifices 7 into the gas manifold assembly 5 13 Remove the pre...

Страница 29: ...vent cross threading hand tighten the plug first then tighten with 3 16 Allen wrench Measuring the Manifold Pressure The manifold pressure must be measured by installing a pressure gauge Manometer Mag...

Страница 30: ...t 105 F 40 C For electrical specifications refer to the furnace nameplate or Table 5 page 32 2 Check all gas connections for leaks with a soap and water solution If the solution bubbles there is a gas...

Страница 31: ...s or 2 Measure the current flow on the thermostat R W circuit after the circulating blower motor has started The six pin terminal marked Expansion Port is not used in the single stage furnace as shipp...

Страница 32: ...MOTOR CONNECTION FIELD WIRING LOW VOLTAGE CONNECTION R C Y G W NOTE The Y terminal on the control board must be connected to the thermostat for proper cooling mode operation Connect R W For Heating O...

Страница 33: ...t gas per hr Local heating value of the gas obtained from gas supplier 1 040 Btu per cubic ft Input rate 1 040 x 90 93 600 Btuh Verifying Adjusting Input Rate IMPORTANT NOTE The input rate must not ex...

Страница 34: ...l for cooling the contactorintheoutdoorcondensingunitisde energized and the control continues to run the fan for a period of 60 seconds Fan Mode When the thermostat energizes the G terminal for contin...

Страница 35: ...rned open Is the gas turned on Are any manual reset switches open Is the filter dirty or plugged Is the flame sensor coated Remove and clean with steel wool Do not use emery cloth or sandpaper Is ther...

Страница 36: ...ter s An air filter is supplied with the furnace as shipped from the factory It is recommended that filters be cleaned or replaced monthly during the heating season WARNING Never operate the furnace w...

Страница 37: ...ng Bottom Return Opening RC Upflow Furnace Model s Dim A Dim B Dim C 054D 24B 17 1 2 15 7 8 16 1 8 072D 35C 21 19 3 8 19 5 8 090D 35C 108D 45D 24 1 2 22 7 8 23 1 8 NOTE Dimensions shown in inches A 34...

Страница 38: ...1590 48 1555 49 1495 51 1435 53 1340 57 Low 1410 54 1390 55 1365 56 1330 58 1310 59 1275 60 1235 62 1210 63 RC090D 35C Side Return 90 000 High 2240 2175 35 2100 37 2040 38 1985 39 1910 40 1825 42 172...

Страница 39: ...agnostic Description Low Flame Sensor Signal Flame Present FAULT CONDITIONS Yellow LED Continuous Flash On Alternating Flash Replaces 710915B IGNITOR INDUCER FLAME SENSOR C BLOWER LIMIT DOOR SWITCH R...

Страница 40: ...44 220 439 84 43 214 429 86 42 209 419 88 41 205 409 90 40 200 400 92 39 196 391 94 38 191 383 96 38 188 375 98 37 184 367 100 36 180 360 102 35 176 353 104 35 173 346 106 34 170 340 108 33 167 333 11...

Страница 41: ...3 0 Manifold Pressure 9 000 to 9 999 FT 49 49 49 49 Orifice Size 2 8 2 8 2 8 2 8 Manifold Pressure Table 12 Table 12 High Altitude Deration Chart for Natural Gas Low Heating Value NATURAL GAS LOW HEAT...

Страница 42: ...air supply inlet to building or the combustion air inlet to any other appliance 6 inches 15cm for appliances 10 000 Btuh 3kW 6 inches 15cm for appliances 10 000 Btuh 3kW 4 ft 1 2m below or to side of...

Страница 43: ...Close to Furnace as Possible 2 x 3 Neoprene Couplings with 2 Hose Clamps Upward Pitch 1 4 Per Foot Exhaust Vent 5 3 Combustion Air Vent Pipe 7 3 x 90 Elbows 3 x 90 Elbow Exhaust Vent 3 Exhaust Vent St...

Страница 44: ...STION AIR X See NOTE 5 X See NOTE 5 PVC Tee PVC Trap X See NOTE 5 X See NOTE 5 PVC Tee PVC Trap Collector Box Drain Factory Equipped See NOTE 2 Inline Drain Field Supplied See NOTES 2 3 Drain Line Att...

Страница 45: ...PE Inline Drain Factory Supplied See NOTE 4 Collector Box Drain Factory Equipped See NOTE 2 Inline Drain Factory Supplied See NOTE 4 Collector Box Drain Factory Equipped See NOTE 2 Drain Line Attached...

Страница 46: ...controls the flow of gas to the burners When the gas valve is energized it automatically opens and regulates the gas pressure in the manifold Inducer Assembly The inducer assembly vents products of co...

Страница 47: ...47...

Страница 48: ...nstructions to the customer s package for future reference ELECTRICAL SYSTEM Electrical connections tight YES NO Line voltage polarity correct YES NO Supply Voltage _________________________________ V...

Отзывы: